Laserfiche WebLink
� <br /> ,I ��� <br /> � � CITY OF ORONO <br /> � � Municipal Offices <br /> � �, 3treet Address Mailing Address: <br /> '� G'�' 2750 Kelley Parkway P.O.Box 66 <br /> '�.,9 ,�� Orono,MN 55356 Crystal Bay,MN 55323-0066 <br /> kEsHo <br /> To: The Current Owner of Address 3120 SUSSEX RD <br /> �it Ordinance requires that onsite sewage treatment systems in Orono be inspected on a <br /> peri ic basis. The onsite sewage treatment system at the above address has been inspected and <br /> the llowing is known about the system. A sketch of the known components of the system is <br /> avai ble for most properties at the Orono City Hall. <br /> Im nent Public Health Threat <br /> Yes �No <br /> If y , please contact the Onsite Systems Manager at 954-249-4626 within 10 days of receipt of <br /> t}�is tice. The septic system must be brought into compliance within 90 days. Failure to do so <br /> will sult in referral to the City Attorney for legal action. <br /> S�yst Identified as No Compliant <br /> Yes <br /> No <br /> If ye system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> ep Tank(s) Pump out Needed <br /> Yes �No <br /> lae ty recommends the septic tank(s) and/or lift tank be serviced and pumped out every three <br /> 3� y s. City records indicate the tank(s)were last pumped out on (�—�-O$— <br /> �3e (s) should be cleaned through the manhole and not through the inspection pipes, this <br /> llo for proper cleaning. <br /> om ents:� <br /> .. <br /> ��� ,, � <br /> �pe or: ��'�..�G ��.�� Date of Ins ection: ���� <br /> P <br /> Telephone (952) 249-4600 • Fax�952) 249-4616 <br /> www.ci.orono.ma.us <br />