Laserfiche WebLink
�°� <br /> � O O CITY OF ORONO <br /> � Municipal Offices <br /> � �, 3treet Address Mailiag Address: <br /> I �� G�' 2750 Kelley Parkway P.O. Box 66 <br /> 'Z„9 4i Orono,MN 55356 Crystal Bay,MN 55323-0066 <br /> kE8H�4 <br /> I <br /> �I T : The Current Owner of Address 3115 SUSSEX RD <br /> I Ci Ordinance requires that onsite sewage treatment systems in Orono be inspected on a <br /> I pe odic basis. The onsite sewage treatment system at the above address has been inspected and <br /> � th following is known about the system. A sketch of the known components of the system is <br /> � a ilable for most properties at the Orono City Hall. <br /> I I 'nent Public Healt hreat <br /> Yes <br /> No <br /> I If es, please contact the Onsite Systems Manager at 954-249-4626 within 10 days of receipt of <br /> j th notice. The septic system must be brought into compliance within 90 days. Failure to do so <br /> j w 1 result in referral to the City Attorney for legal action. <br /> I S tem Identified as No ompliant <br /> Yes <br /> No <br /> il es, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> � S tic Tank(s) Pump out Needed <br /> Yes �No <br /> ie city recommends the septic tank(s) and/or lift tank be serviced and pumped out every three <br /> ( years. City records indicate the tank(s)were last pumped out on ' $��p J <br /> e tank(s) should be cleaned through the manhole and not through the inspection pipes, this <br /> a ows for proper cleaning. <br /> mments: <br /> ��./i��_"�-r � <br /> � <br /> pector: Date of Inspection: � d � <br /> Telephone (952) 249-4600 • Fax(952) 249-4616 <br /> wwa.ci.orono.ma.us <br /> I <br />