Laserfiche WebLink
TI <br /> �O� <br /> 0 0 / <br /> CI'TY OF ORONO <br /> I � � MuaicipalOffices <br /> �, Street Address Mailing Addresa: <br /> � �j�' 2750 Kelley Parkway P.O.Box 66 <br /> '�„9 �i Orono, MN 55356 Crystal Bay,MN 55323-0066 <br /> i kEsBo�' <br /> To� The Current Owner of Address 3045 SUSSEX RD <br /> Ci� rdinance requires that onsite sewage treatment systems in Orono be inspected on a <br /> pe o 'ic basis. The onsite sewage treatment system at the above address has been inspected and <br /> th fo lowing is known about the system. A sketch of the known components of the system is <br /> av�ila e for most properties at the Orono City Hall. <br /> Im�ni �ent Public Health Threat <br /> � Yes � <br /> No <br /> If�es, please contact the Onsite Systems Manager at 954-249�-4626 within 10 days of receipt of <br /> thi n tice. The septic system must be brought into compliance within 90 days. Failure to do so <br /> wil�r lt in referral to the City Attorney for legal action. <br /> Sy'te Identified as Non-Compliant <br /> 'Yes � <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> � 1�ther <br /> Sep�tic Tank(s) Pump out Needed <br /> Yes <br /> �To <br /> Th ci y recommends the septic tank(s) and/or lift tank be serviced and pumped out every three <br /> (3) e . City records indicate the tank(s) were last pumped out on /� - (S� <br /> Th t � (s) should be cleaned through the manhole and not through the inspection pipes, this <br /> allo�vs �'or proper cleaning. <br /> Co � nts: <br /> w <br /> Ins ec Date of Inspection: �" � � <br /> � - <br /> Telephone (952) 249-4600 • Fax(95Z� 249-4616 <br /> www.ci.orono.mn.us <br />