My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-009904 - new septic system
Orono
>
Property Files
>
Street Address
>
S
>
Sussex Road
>
3011 Sussex Road - 04-117-23-32-0018
>
Septic
>
1998-009904 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:12:09 PM
Creation date
4/10/2019 9:20:29 AM
Metadata
Fields
Template:
x Address Old
House Number
3011
Street Name
Sussex
Street Type
Road
Address
3011 Sussex Rd
Document Type
Septic
PIN
0411723320018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- �l <br /> � .7-P TESTING� �NC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License#394 <br /> REVISED <br /> January 16, 1998 <br /> July 19, 1989 <br /> Tony Eiden <br /> Lot 7, Block 2 <br /> Fox Bend <br /> Orono, Henn. Co., MN <br /> This on-site sewage treatment system is designed for a Type 1, four bedroom home, in <br /> acxordance with the Minnesota Pollution Controt Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site are SCS soils mapped - Ha - Hamel loam. The seasonatly <br /> saturated soils were located at 12" to 24" (mottled soil). Due to the seasonally saturated <br /> soils, a Pressurized Mound System will need to be instatled to treat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 18" have a percolation rate averaging 24.5 mpi. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A waming device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be tumed over, <br /> just break up the sod, be sure not to over work. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.