Laserfiche WebLink
� i <br /> CITY OF ORONO SEPTIC SYSTE�I PERiI��IIT APPLICATION <br /> Bo�c 66 (2750 Kelley Parkway) <br /> Crystal Bay, NI�t 5�323 <br /> �os srrE AnnxEss: .3 0 t 1 � ��s C � <br /> Occupancy Type: Residential k Commercial Other <br /> Permit Type: Ne�v or Replacement Sy�stem, $100.00 <br /> Repair Existina System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.�0 State surcharge added to above fees <br /> , *See fee schedule for non-residential permit fees <br /> O�vner's I�Tame: l�iv.' ��- �,��-t _ PhoneNumber: <br /> I1�Iailing Address: �� City: �p: <br /> Contractor's ?�Tame:�����e-. / �7! �c -���_ PhoneNumber: 7��3 ��/r.s'� <br /> Nia.iling Address• City: �p� <br /> DO \TOT 1�IAII, PAI'�IENT WITH THIS APPLICATIO�' <br /> GEtirERAL P�STRUCTIO\TS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not be;in unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Desi?n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4, The follow•inj inspec[ions will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general con[ractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench i.nstallation prior to coverin�. For mounds, inspection is required <br /> after rouah-up bu[ prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain durin; pressure distribution pipin� installation in the rock bed. <br /> D. Fi.nal i.nspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holdin�MPCA Installer Certificate shall be present durin? inspections: A 24- <br /> hour notice is required for all inspections. <br />