Laserfiche WebLink
g-��o <br /> C ITY OF ORONO <br /> � � Street Address: Mailing Address: Telephone(952)249-4600 <br /> �, Gti 2750 Kelley Parkway I P.O.Box 66 I Fax (952)249-4616 <br /> l,q t�, Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> kFsxo� <br /> June 24,2015 <br /> Juan Cristiani <br /> 3011 Sussex Road <br /> Long Lake, MN 55356 <br /> Re: Building Permit Application#2015-00582 <br /> We received a building permit application for deck. Staff conducted a preliminary review based on the information <br /> provided and recommends the following items be submitted or revised in order for your application to be considered <br /> complete and for the plan review to continue: <br /> 1. Certificate of Survey. <br /> • A site plan was submitted. The site plan does not show the septic line which appears to exit the <br /> house under the porch and potentially the deck. Please have the septic line and tanks shown on the <br /> site plan. <br /> • The site plan did not show the drainage easement on the property. Upon further review of our <br /> maps, it appears a wetland extends along the northwest line of your property. <br /> 2. Wetlands. Based on our available information, it appears there is a wetland within the subject property. <br /> This wetland appears to be located within 150 feet of the proposed project. Because Orono City Code <br /> requires a 35-foot setback from any wetland for structures or hardcover,the location of the wetland must be <br /> indicate n the survey. Setbacks must be verified with wetland delineation information. <br /> Leve12 Delineation is required. <br /> A Level 2 delineation shall include the exact surveved boundarv of the wetland shown on the <br /> certificate of survey. <br /> 3. Escrow & Escrow Agreement. Permits involving grading and/or review by the City's engineer require <br /> submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement <br /> to the City for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will <br /> guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater. The required <br /> escrow amount for this project is $700. The escrow agreement is enclosed. The property owner must sign <br /> the escrow agreement and submit a check for$700. <br /> 4. Separate City Permits Required for: <br /> a. Zoning Permit. Prior to the commencement of � exterior/landscaping improvements, i.e. patios, <br /> grading, sidewalks, retaining walls, etc., not currently shown on the site plan/survey requires a Zoning <br /> Permit application be submitted and approved. <br />