My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-004546 - new septic system
Orono
>
Property Files
>
Street Address
>
S
>
Sussex Road
>
2990 Sussex Road - 04-117-23-31-0020
>
Septic
>
1992-004546 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:11:33 PM
Creation date
4/9/2019 1:12:02 PM
Metadata
Fields
Template:
x Address Old
House Number
2990
Street Name
Sussex
Street Type
Road
Address
2990 Sussex Rd
Document Type
Septic
PIN
0411723310020
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1y 1 <br /> d • <br /> • <br /> � 9 1 KATYDID LANE <br /> -- p7°Ir. mak: 7�4 '..' ,CHAEL, MN 55376 <br /> k � 497-3566 <br /> spa ' �1 <br /> .� <br /> LJSt en B. SChirmers <br /> July 19 , 1989 <br /> Nina Wildman Property <br /> Lot 3 , Blk . 3 , Fox Bend <br /> Orono , Henn. Co. , MN <br /> This system is Designed for a Type 1, four bedroom home and in accordance <br /> with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances . <br /> The soils on this site are typical of SCS soils mapped - LrB - Lester <br /> loam. A seasonally high water table was located at 18" , 20" , 22" , <br /> 24" , 26" & 30" , (mottled soil ) . Due to the seasonally high water table, <br /> a pressurized mound system will need to be installed. The bottom of the <br /> , rock bed must be located at least 3 ' above the seasonally high water <br /> table . <br /> The soils at a depth of 18" have a percolation rate averaging 13 . 8 <br /> min/inch and are adequate for. treating septic effluent . <br /> A pumping chamber will need to be installed to lift the effluent to the <br /> treatment area . <br /> The manifold and supply line pipe must have back drainage to the pumping <br /> chamber . The distribution pipes shall have their ends capped . Be sure <br /> the rock and sand fill material are clean. The sod layer below the <br /> entire mounded area must be turned over , just break up the sod, be sure <br /> not to over work. <br /> The power supply and switches must be located outside the manhole and <br /> pumping chamber in a weather proof enclosure . A warning device must be <br /> installed with a light and sound device, this is in case of a pump failure. <br /> (Mercury floats are a good method) . <br /> All neighboring wells are located more than 100 ' away from the proposed <br /> treatment area . <br /> Keep all heavy equipment off of the proposed treatment area before and <br /> after construction as much as possible . The treatment area should be <br /> marked off before construction . <br /> With proper installation . and maintenance, this system should have no <br /> problem in treating septic effluent effectively. <br /> Recommend to pump .the septic tank every year if there is only 1 tank <br /> & every 2 years if there are 2 tanks . _ <br /> Soil and Percolation Tests • S---C _- 2 • <br /> Septic System Design Steven B. Schirmers IDS <br /> SBS/cls <br />
The URL can be used to link to this page
Your browser does not support the video tag.