My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06888 - septic
Orono
>
Property Files
>
Street Address
>
S
>
Sussex Road
>
2980 Sussex Road - 04-117-23-31-0021
>
Septic
>
2003-P06888 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:11:40 PM
Creation date
4/8/2019 3:24:28 PM
Metadata
Fields
Template:
x Address Old
House Number
2980
Street Name
Sussex
Street Type
Road
Address
2980 Sussex Rd
Document Type
Septic
PIN
0411723310021
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . • 9 <br /> PUMP SELECTION PROCEDURE <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minimum suggested is 20 gpm <br /> 2. Maximum suggested is 45 gpm Perforation Discharges in GPM <br /> Head Perforation diameter <br /> Pressure Distibution feet inches <br /> 3.a. Select number of perforated laterals 7/32 i/4 <br /> b. Select perforation spacing= feet. 1.oa o.sb o.7a <br /> c. Subtract 2 ft. from the rock layer length. 1.5 0.69 0.90 <br /> 2.Ob 0.80 1.04 <br /> R�iaye�i�g�n"2 ft. = feet. <br /> d. Determine the number of spaces between perforations. a Use 1.o foot single homes. <br /> Length perf.spacing= ft.= ft.= spaces b Use 2.0 feet for anything else. <br /> e. spaces+1 = perforations/lateral <br /> f. Multiply perforations per lateral by number of laterals to <br /> get total number of perforations. r e�a 5 x ��5,�e�r = perforations. <br /> � S• � X�,m �� = gPm. <br /> SELECTED PUMP CAPACITY-'�SPm <br /> B.Deteraune head requirements: <br /> 1. E�evation difference between pump and point of discharge. <br /> _�feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure Soil teatment system <br /> required at manifold if gravity system,zero. °•°="=°� <br /> .Sr feet row y;��g,gm <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. ,,,� . ��„�„�R„re <br /> Read friction loss in feet per 100 feet from table(F-14). P`� <br /> ------- -- - <br /> F.L._ • ft./100 ft of pipe ................. . <br /> b. Determine total pipe length from pump to dischazge �-��-----------���-���------�-----��� <br /> point. Estimate by adding 25 percent to pipe length for fitting <br /> loss,or use a fitting loss chart(F-15 feet). <br /> Equivalent pipe length-125 times pipe length= <br /> ��x 1.25=��feet Friction Loss in Plastic Pipe <br /> c. Calculate total friction loss by multiplying <br /> friction loss in ft/100 ft by equivalent ipe length Nominal <br /> pipe dia. <br /> Total friction loss=3'�x�=100= � feet <br /> 4. Total head required is the sum of elevation difference, �O�'�'m te 1.5" 2" 3" <br /> special head requirements,and total friction loss. � <br /> � 20 2.47 0.73 0.11 <br /> �_+ +�_ 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 6.96 2.06 0.30 <br /> 40 8.91 2.64 0.39 <br /> TOTAL HEAD ��feet � 11.07 0.48 <br /> 13.46 3. 0.58 <br /> C. Pump selection bo 5.bo o.s2 <br /> 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> 1. A pump must be selected to deliver at least <br /> �gpm (Step A) with at least �feet of total head (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.