Laserfiche WebLink
« <br /> CITY OF ORONO SIFPTIC SYSTEM PERMTT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> JOB SIT`E ADDRESS: ����� �v`�S� �' <br /> Occupancy Type: Residential �_ Commercial Other <br /> Permit Type: New or R�cement��tenu, $100.00 <br /> Rep xrai E isting System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name:��<� �C�=Q��. Phone Number: <br /> Mailing Address: City: 7ip: <br /> Contractor's Name• �' ( 1 -es �� (( '� c�, PhoneNumber: �i Z- 3zS- y� <br /> Mailing Address: �`�{ �' ` Cit G�«C ��' .S� 7 4 <br /> i ��u ct:.a�re 1'�c.� C Y� S �,f' �P� 3 <br /> � <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present durina inspections. A 24- <br /> hour notice is required for all inspections. <br />