Laserfiche WebLink
� .. <br /> CITY OF ORONO S�P'TIC SYSTEM PERMIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, NIN 55323 <br /> JOB SITE ADDRESS: �� �-�� �ln� x �1� �`► <br /> Occupancy Type: Residential �� Commercial Other <br /> Permit Type: New or Replacement System, $100.00 ��� �' ��-- <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name• ����e n ��.� � PhoneNumher: L( �S �S � � <br /> Mailing Address: L,�: � +-.��� S -v k..:-� City: �l 1�-��-, Zp: �> S�3 y 3 <br /> Contractor's Name: (� ��._ �`��� PhoneNumber: `{ 7 � Z3 I '� <br /> Mailing Address: 5� ;�, ��1, • �,� `�� .— City: >>�i ,, �, 7�p:��-J <br /> DO NOT MAII. PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS GITY OF C�R�Jf�� <br /> 1. Applications for septic system permits may be mailed or submitted 'u �I����,E �����,� <br /> Offices; however, permits will not be mailed out. The permit mu <br /> person at the City Offices and work must not begin unless the permi �������� <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Or� <br /> Installers License. 13?1S(JI�Q�1�1 � <br /> 50. 0 <br /> 3. All work must be done in accordance with the approved septic sysu �j��[�(���a ��. � <br /> reports are not considered approved unless accompanied by the C: Q1 GEN I00. <br /> System Approval" cover sheet signed by the City Inspector. 1??��QQQQ[i � <br /> � O1, y� 7cog.50 <br /> 4. The following inspections will be required for all septic systems: -�i�uX" _.e.. <br /> A. Pre-installation site inspection to include inspector, installer, and �HEC iS�1.�Q <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, in <br /> after rough-up but prior to sand placement (sand will be jar test �f�EIPT-THANk �'f_11� <br /> and again during pressure distribution piping installation in the �����:�'�-� ���� ��1 Tl���1L <br /> D. Final inspection to verify proper final cover depths and to verify <br /> (where required) components are functional and comply with cc <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br /> n��� <br /> � <br />