My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P02827 - new septic
Orono
>
Property Files
>
Street Address
>
S
>
Sussex Lane
>
455 Sussex Lane - 04-117-23-32-0011
>
Septic
>
2000-P02827 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:11:57 PM
Creation date
4/4/2019 3:06:16 PM
Metadata
Fields
Template:
x Address Old
House Number
455
Street Name
Sussex
Street Type
Lane
Address
455 Sussex La
Document Type
Septic
PIN
0411723320011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r �+ /�/ <br /> �7fP TEST/NG� //r�. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michaei, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License#:i94 <br /> Revised July 17, 2000 <br /> Tony Eiden Company <br /> Lot 5, Block 1 <br /> Fox Bend <br /> Orono, Henn. Co., MN <br /> This on-site sewage treatment system is designed for a Type 1, five bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site are SCS soils mapped - LrB - Lester loam. The seasonal{y <br /> saturated soils were located at 18" to 30" (mottled soil). Due to the seasonally saturated <br /> soils, a Pressurized Mound System will need to be instatled to treat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate of 12.9 mpi. <br /> A pumping chamber will need to be instatted to lift the effluent to the tr�eatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A waming device must be instaNed with a light <br /> and sound device, this is in case of a pump faifure. <br /> The manifold and supply line pipe must have bacic drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sur�e the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be tumed over, <br /> just break up the sod, be sure not to over work. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.