My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-006115 - new septic system
Orono
>
Property Files
>
Street Address
>
S
>
Sussex Circle
>
560 Sussex Circle - 04-117-23-32-0020
>
Septic
>
1994-006115 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:12:12 PM
Creation date
4/4/2019 1:19:33 PM
Metadata
Fields
Template:
x Address Old
House Number
560
Street Name
Sussex
Street Type
Circle
Address
560 Sussex Cir
Document Type
Septic
PIN
0411723320020
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � . . <br /> � . , ��' <br /> � � . <br /> � :. �'-� �'�S�'�NG, INC. <br /> � 951 KATYDID LANE <br /> ; , ' ST. MICHAEL, MN 55376 <br /> � 497•3566 <br /> , ; -. . <br /> ' " ; Steven B.. . S�hir;meXs . <br /> � _ <br /> � July 19 , 1989 � <br /> Nina Wildman Property � <br /> Lot 3 , Blk. 2, Fox Bend . <br /> Orono, Henn. Co. , MN � <br /> This system is Designed �or a Type 1, four bedroom home and in accordance <br /> with the Minnesota Pollution Control Agency Chapter 7�080 and local <br /> ordinances . ' <br /> The soils on this site are typical of SCS soils mapped - LrB - Lester �. <br /> loam, more typical of Heyc�er soil at primary site. A seasonally <br /> high water table was located at � 30" , 34" 58" & 60" , (mottled soil) . <br /> The bottom of each trench must be located at least 3 ' above the <br /> .• seasonally high water table. A standard trench system may be installed <br /> in the area of TH's #1, 2,3 ,&4 . A pressurized mound system will need <br /> to be installed in the area of TH' s #5 & 6 , the future expansion area. <br /> The soils at a depth of 22" & 24" have a percolation ,rate averaging 1. 9 <br /> min/inch in the proposed treatment area. � <br /> Each trench will need to be over excavated a minimum of 12" and be <br /> replaced with uncompacted loamy sand. This liner is needed to slow the <br /> effluent down for treatme�t. If drop boxes are used with a minimum of <br /> 4 trenches , this liner is not needed. • , <br /> A pumping chamber �ill need to be installed to lift the effluent to the <br /> treatment area. � <br /> The power supply. ahd switches must �be located outside the manhole and <br /> pumping chamber in a �.weather proof enclosure. A warning device must be <br /> installed with a light and sound device, this is in case of a pump failure. <br /> (Mercury floats are a good m�thod) . The supply line pipe must have back <br /> drainage to the p•umping chamber. <br /> All neighboring we:lls are located more than 100 ' away from the proposed . <br /> treatment area. � ' . <br /> Keep all heavy equipment off of the proposed treatment area before and <br /> after construction' as much as possible. The treatment area should be <br /> marked off before construction. - <br /> '� • <br /> ;; , <br /> � � <br /> �� �. � Soil and Percolution Teata • CONT'D <br /> ' , • . Septic Syatem Deaign <br />
The URL can be used to link to this page
Your browser does not support the video tag.