Laserfiche WebLink
. <br /> a „ - <br /> CITY OF ORONO SEPTIGSYSTEM PERMIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> JOB SITE ADDRESS: S�� �`,�s�� ��cG� <br /> Occupancy Type: Residential /� Commercial Other <br /> Perrnit Type: New or Replacement System, $100.00 �/OU°O <br /> Repair Existing System, $ 50.00 <br /> �:50-State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: J A,MF,S (�►+,-rnn�s PhoneNumber: <br /> Mailing Address: ,�'6� S�.ssr,,c G.'Q_ City: Q{�oNo ZP�_�:s" ,� <br /> Contractor's Name: i9AA ����no,� �u-r/�- PhoneNumber: 7�g-s35�/ <br /> Mailing Address: /,f'ZS � STclrl.iNG- ST• City:.,�'s, p�v� Zp: S"'S/� <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Uffices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components arP functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. <br /> i <br /> (� ��� <br />