My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-1998 S-P Testing, Inc
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
310 Big Island - PID: 23-117-23-32-0073
>
Septic
>
08-10-1998 S-P Testing, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:13:42 PM
Creation date
3/27/2019 2:51:44 PM
Metadata
Fields
Template:
x Address Old
House Number
310
Street Name
Big Island
Address
310 Big Island
Document Type
Septic
PIN
2311723320073
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> PUMP SELECTION PROCEDURE <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minimum suggested is 20 m <br /> 2. Maximum suggested 5 m Perforation Discharges in GPM <br /> Head Perforation diameter <br /> Pressure Distibution (feet) (inches) <br /> 3. a. Select number of perforated laterals 7/32 1/4 <br /> b. Select perforation spacing= feet. 1.0a 0.56' 0.74 <br /> c. Subtract 2 ft. from the rock layer length. 1.5 049 0.90 <br /> 20b 0.80 1.04 <br /> Reck layer length <br /> -2 ft.= feet. <br /> d. Determine the number of spaces between perforations. a Use 1.0 foot single homes. <br /> Length perf.spacing= ft.+ ft. = spaces b Use 2.0 feet for anything else. <br /> e. spaces+ 1 = perforations/lateral <br /> f. Multiply perforations per lateral by number of laterals to <br /> get total number of perforations. x perts,utuat= perforations. <br /> g. vas x 1pnv> = gpm. <br /> SELECTED PUMP CAPACITY l-1 S' gpm )1")A.)L <br /> B.Determine head requirements: <br /> 1. Elevation difference between pump and point of discharge. <br /> `) feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure soil treatment system <br /> required at manifold if gravity system,zero. <br /> --- feet Total pipe length "s'/- <br /> 3. <br /> 3. Friction loss __ <br /> a. Enter friction loss table with gpm and pipe diameter. k Elevation Diff creme <br /> Read friction loss in feet per 100 feet from table(F-IA). pipe t M,w <br /> F.L.= "?,;� 'r. ft./100 ft of pipe ;s <br /> • <br /> b. Determine total pipe length from pump to discharge 7...-..-. .• <br /> point. Estimate by adding 25 percent to pipe length for fitting <br /> loss,or use a fitting loss chart(F-15 feet). <br /> Equivalent pipe length- 1.25 times pipe length= <br /> x 1.25= Li y feet Friction Loss in Plastic Pipe <br /> c. Calculate total friction loss by multiplying <br /> friction loss in ft/100 ft by equivalent pipe length. Nominal <br /> Total friction loss= 3•a x Li L) +100= 1 feet pipe clia. <br /> 4. Total head required is the sum of elevation difference, Flowte 1.5" 2" 3" <br /> special head requirements, and total friction loss. <br /> 20 2.47 0.73 0.11 <br /> + + 1 25 3.73 1.11 0.16 <br /> ' (1) (2) (3c) 30 5.2.3 1.55 0.2.3 <br /> 35 6.96 2.06 0.30 <br /> TOTAL HEAD /0 feet ` 1 2.28 0.39 <br /> 45 5 111..00 7 3.28 0.48 <br /> -50 13.46 3.99 0.58 <br /> 55 4.76 0.70 <br /> C. Pump selection 60 5.60 0.82 <br /> 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> I . <br /> 1. A pump must be selected to deliver at least <br /> L-LC gpm (Step A) with at least /0 feet of total he (Step B). <br /> t--)A X <br />
The URL can be used to link to this page
Your browser does not support the video tag.