Laserfiche WebLink
°1999 Westwood Professional Services, Inc. <br /> ' / / _- LEGEND <br /> �^ ------- <br /> ` Z1---_ ex/sting well <br /> ,/ soil boring <br /> Q percolation test <br /> / xpsi <br /> • existing fence <br /> 1/ \ -------- <br /> existing deciduous tree <br /> / /%� —� existing coniferous tree <br /> • <br /> // / �- \ —- — existing elevation contour <br /> 92x4 existing spot elevation7/ / \ <br /> . \ <br /> 192x4 proposed spot elevation <br /> / ❑/ Elevations relative and assumed <br /> / f (--- <br /> '2( Elevations relative to U.S.t S. 1929 N.G VD. <br /> / 6 . \) \:) <br /> Denotes proposed surface drainage <br /> CD <br /> PK1MARYSE.T C Y M ,. 1,\I • .� \ \ ___\, <br /> (4 SF 0 ID11PC • cs) \ Notes:. <br /> • • cp <br /> GRAVEL' T'E C I P �, �p 1. Avoid compaction in septic area before, during and <br /> 00 after construction <br /> 56 3 \ \• <br /> 'SOP E <br /> W 2 Trenches are to be installed parallel to the contours and the <br /> V <br /> \ pR pPWALL , ' N trench excavations are not to exceed a max/mum depth of <br /> 16(1/44:11E TE ATE SEP I C •I T eEDRO M I 12 inches be/ow the existing ground surface. <br /> ,3. Verify before drilling that no septic tanks or drain fields <br /> (41 L OF 10 I D 1 <br /> are within a 50 foot radius of proposed well location. <br /> CRAS LE S 'ENCH ` ���� 111 <br /> (100 feet for shallow well) <br /> \ .:1 S 3 �, 4. Verify before construction that no shallow wells ore within <br /> ‘110, . b 100 feet, or deep wells within 50 feet of proposed septic <br /> —(( <br /> r ' tanks or drain field area. <br /> X A\1 40 <br /> `\ �� 2 1 5. To extend the life of septic system pump septic tanks a <br /> minimum of every 2 years. <br /> 6. <br /> S 22 \I\ tl \ •L- <br /> 300 L�� �� E See attached sheets for additional construction details <br /> C s- I , . / <br /> SB 1 • , 821 ��R OP BOX T , / 7 Soil Classified as Hubbard loamy sond(HbD) 12-181 slopes, <br /> U. <br /> according to the S. Department of Agriculture soil Survey <br /> ) (---cr \ 8. Site plan prepared by or under the supervision of Bernie <br /> Q ��S�` <_}.1)/31F <br /> T N D Miller— 4.P.C.A. License No. 43 <br /> r g,,. -•-_.,,,„__._____„,,___..,,__,.,,,_ <br /> / ,„------------- <br /> � 15-f------ �r /✓l Dater—z/--Zr <br /> 75 WETLAJ <br /> Nit <br /> -____ <br /> . \..................-----_____ ....------- . , <br /> }--- ,, .),_) ---- 0 40 80 120 <br /> yr Westwood Property location: DESIGNED BCM REQUESTED BY: DATE <br /> Westwood Professional Services, Inc BCM Septic System 4/20/99 <br /> 104 Marty Drive, Suite 3 <br /> Lot 1 CARRIAGE HILL, Orono CHECK Site Plan I [ Bohland Development <br /> Buffalo, MN 55313 CHECKED JMc <br /> [ <br /> 612 682-2587 Job No. <br /> Plymouth,MN. <br /> 98795 <br />