My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/21/1999 -letter re: Septic System Site Plan
Orono
>
Property Files
>
Street Address
>
C
>
Carriage Lane
>
2120 Carriage Lane - 10-117-23-24-0036
>
Septic
>
04/21/1999 -letter re: Septic System Site Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:22:12 PM
Creation date
3/27/2019 2:44:12 PM
Metadata
Fields
Template:
x Address Old
House Number
2120
Street Name
Carriage
Street Type
Lane
Address
2120 Carriage Lane
Document Type
Septic
PIN
1011723240036
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIZESSUKL DISTIZIBUI-I_C)N SYSTEM t.cotextilc•tatm( <br /> 1 Select number of perforated laterals 3 _ FL 12.. <br /> IQuarter inch perforations spaced®3' <br /> 2. Select perforation spacing = 3 feet. 9"of rock <br /> 3. Since perforations should not be placed closer than 1 ft. to Pert Sizing 7/32- - 1/4" <br /> Pert Spacing 1-5'-5' <br /> the edge of the rock layer (see diagram), subtract 2 ft. from <br /> the rock layer length. <br /> Roca,63,gth - 2 ft. = 6 l feet. <br /> Requited Perforation Discharge <br /> 4. Determine the number of spaces between perforations. in gallons per nunu1ftgpmi <br /> Divide the length above by perforation spacing and round Dei` :�"" ;* <br /> down to nearest whole number. (r. <br /> 1.0a 0.56 0.74 <br /> 2.0b 0.80 1.04 <br /> Length perf. spacing = 61 ft. _ 3 ft. = spaces _ <br /> (3) (2) a.Use for single family homes <br /> b.Use for all other applications <br /> 5. Number of perforations is equal to one plus the number of <br /> perforation spaces . <br /> Maximum number of quarter inch perforations per <br /> ZO spaces + 1 = 2,1 perforations/lateral lateral to guarnantee<10%discharge variation <br /> Perforation <br /> 6. Multiply perforations per lateral by number of laterals to SPaci g 1% 1 i 2 <br /> get total number of perforations. 2.5 14 18 28 <br /> x Z I = 6.3 perforations. <br /> 3.0 13 17 26 <br /> laterals pens/lateral P <br /> 3.3 12 16 25 <br /> 7. Determine required flow rate by multiplying 4.0 11 15 23 <br /> number of perforations by flow per perforation 5.0 10 14 22 <br /> 63 x o-?y _/../7 <br /> perfs gpm/perf gPm MamWIU LOCATED AT ero of PRESSURE oTsrnreuraH s*srrw <br /> ,..`` <br /> 8. If laterals are connected to header pipe as shown on upper <br /> example, to select minimum required lateral diameter; enter d-''-- .ice <br /> table with perforation spacing and number of perforations % .,��, <br /> per lateral. Select minimum diameter for `? <br /> perforated lateral = pp" inches. <br /> L� 1 04 ---UrCRaLS Ip.. <br /> rp'e4(4/C fM SrY�r.Ow F..U..4 <br /> �_a w•(ee�..�. Q ref <br /> 9. If perforated lateral system is attached to manifold pipe near =� r-'---"'"--.��� ' ";W,..— ___------ <br /> the <br /> ----=the center, lower diagram, perforated lateral length and - --,;«�,�,.��-- <br /> number of perforations per lateral will be approximately roximately one , <br /> pP -- .•.:.:_- <br /> half of that in step 8. Using these values, select minimum ., <br /> diameter for perforated lateral = _VVI inches. .-,-- ,,,,,,'���� _.�, _. <br />
The URL can be used to link to this page
Your browser does not support the video tag.