Laserfiche WebLink
o�olr ��� <br /> . . <br /> • �� � a-� �o� <br /> WORK ORDER <br /> Roger and Jean King <br /> 2011 Sugarwood Drive <br /> Orono, MN 55356 <br /> Proposed Remodeling and Updates to 3 Bathrooms <br /> Master Bath <br /> 1. Removal and disposai. Remove and dispose of the following: <br /> a. Shower enclosure. <br /> b. Ail floor, shower,tub deck, tub deck border and base tile. <br /> c. All tile backer at tub deck and shower. <br /> d. All mud and lath at floor in toilet and shower areas. <br /> e. Mirror frame and frame. <br /> f. Tub,tub faucets, lav top, lavs (2), faucets (2), shower faucet and toilet. <br /> g. Bath door hardware. <br /> h. Cabinet hardware. <br /> i. Part of tub deck and shared shower wall. <br /> 2. Framing <br /> a. Frame shampoo shelves. <br />