My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-005342
Orono
>
Property Files
>
Street Address
>
S
>
Sugarwood Drive
>
2010 Sugarwood Drive - 34-118-23-21-0007
>
Permits/Inspections
>
1993-005342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:54:26 PM
Creation date
3/27/2019 12:14:31 PM
Metadata
Fields
Template:
x Address Old
House Number
2010
Street Name
Sugarwood
Street Type
Drive
Address
2010 Sugarwood Drive
Document Type
Permits/Inspections
PIN
3411823210007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � ��,,r-�---�-� � -�3��- <br /> ;�� �� � <br /> ,� _ ... <br /> . , �� �.i�_�� . <br /> , <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMI'r <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 ��"�Y `�'. `� ��-'c'� <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a pernut will be issued within 2 working days. <br /> 2. Pernut cards will be sent by retum mail after a review is completed. PERMITS ARE NOT VALID <br /> UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical Designs - Complete calculations, details and specifications are required for each heating, <br /> ventilation,humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building perm.it must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the pemut fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 473-7357. <br /> Please check one: � New Addition Repair Replace <br /> Residential ercial <br /> JOB SI'TE: / Zip: <br /> Owner's Name: Telephone Number: <br /> Mailing Address: ity: Zip: <br /> Contractor'sName: i i�� TelephoneNumber: ���-G�%CJL� <br /> MailingAddress: � City: ��'' Zip: , � � �---- <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: � <br /> Make: ����C � <br /> Model: - ' -" <br /> Fuel: _S <br /> Flue Size: '�_ `� <br /> , <br /> Input BTUs: '�' ?U <br /> Output BTUs: ) °� <br /> CFM: <br /> COOLING SYSTEMS � <br /> Quantity: l <br /> Make: � - � <br /> Model: %���C ���_ �%i�'V <br /> Tons: �_ �,� <br /> H. Power <br />
The URL can be used to link to this page
Your browser does not support the video tag.