Laserfiche WebLink
� Series 200 Sn r C�'" <br /> �� � <br /> Structural Report and Calculations <br /> Aluminum Ground Rail Snans <br /> The alunlinuin ground rails used to connect the PV panels to the racking system should be <br /> installed per the diinensions on the following detail for all tilt angles. With these lengths <br /> being constant the horizontal span between the footings will be different for every tilt angle. <br /> See detail and chart on page C2 for dimensions. The standard installation of the aluminum <br /> rail is two rails per row of PV panels. See chart located on page C 14 for conditions where <br /> three rails per row of PV panels are required. The rails are to be connected to horizontal <br /> pipes with SnapNrack pipe clamps on the bottom of the rail and module clamps on the top , <br /> in order to secure the PV panels. <br /> RAIL CEMERED ON PIPE <br /> RA�I CEHTERfO ON PIPE SUPPORT STRUCTURE <br /> SUPPORT STRUCTURE �+ <br /> /� <br /> 6'fWl SPAN <br /> 8'W1il SPItN <br /> ARRIIY T11.T I�NGLf <br /> ARRAY T�T ANGLE <br /> 4 MODULE PANEL, TYPIUL 3 MODUIE PANEL,TYPICAL <br /> NSS�+ �022 Sunrise Boule��ard Fair Oaks CA 95628(916)536-9585 P1ge 5 <br />