Laserfiche WebLink
� <br /> � <br /> � ��i�� <br /> CITY OF ORONO SEPTIC SYSTEI�i PER1tiIIT APPLIC�,TION <br /> Box 66 (2750 Kelley Pazkway) <br /> Crystal Bay, N�t 55323 <br /> JOB STI'E ADDRFSS: �'� S~� � .s � �- � �� <br /> Occupancy Type: Residential � Commercial Other <br /> Permit Type: Netiv or Replacement System, $100.00 � <br /> Repair Existin; System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees � <br /> ,� *See fee schedule for non-residential permit fees <br /> Owner's h'ame: �oa a- Q �,✓�- ��s��- PhoneNumber: �{7 5 - O?6 S <br /> Nlailing Address: F�� S�� 6� �3� .� City: C��o�v o �P'rS�s 6 <br /> Contractor's Name: �►-�,��,o� �3 2 a S . PhoneNumber: �Z �-� 3 9 3 <br /> lYlailing Address: 232�0 !Dy � �2' �� City: Ro �.�-,� S 7�p: SS3 � �/ <br /> DO NOT 11�IAIi. PAYI��IENT WITH THIS APPLICATION <br /> GEYERAI, INSTRUCTIO�tS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not begin ualess the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance �vith the approved septic system design. Desi�n <br /> reports are not considered approved unless accompaaied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-inscallation site inspection to include i.nspector, installer, and general contractor. <br /> B. Tank installation prior to coverin;. <br /> C. Drainfield trench installation prior to coverin�. For mounds, inspection is required <br /> afrer rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain during pressure distribution pipin� installation in the rock bed. <br /> D. Final inspection to verify proper fmal cover dep[hs and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holding N1PCA Installer Certificate shall be present during inspectioas: A 24- <br /> hour notice is required for all inspections. <br />