My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-P08027 - new septic
Orono
>
Property Files
>
Street Address
>
S
>
Stubbs Bay Road North
>
440 Stubbs Bay Road North - 32-118-23-13-0006
>
Septic
>
2004-P08027 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:39:24 PM
Creation date
3/20/2019 12:43:31 PM
Metadata
Fields
Template:
x Address Old
House Number
440
Street Name
Stubbs Bay
Street Type
Road
Street Direction
North
Address
440 Stubbs Bay Road North
Document Type
Septic
PIN
3211823130006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
67/21/2604 14:01 3262382343 HENTGES PAGE 11/1�4 <br /> PUMP SEl.EC710N PR�CEDURE <br /> A. Pump cap�cfty <br /> Already determined f�om PRESSURE DISTRIBUTION PAGE, line#7 <br /> Pump cap�city = � 35 GPM <br /> "* Pump capacity should be between 20 and 4p GPM far charging a manifold <br /> ar for pumping to a gravity situation, ie, a drop box or distribu#ion box. <br /> B. Determine h��d requirements <br /> 1. Elevation diffe�ence between pump �nd the paint of discharge = '�fl <br /> 2, If pumping to a pressure distribution system, �dd 5 feet af head required at the <br /> m�nifold. If pumping to a gravity syst�m, use zero (0} feet of head. � <br /> 3. Determi�e friction loss <br /> a. Enter fric#fon loss table with gprn 35.3 and pipe diam�ter 2,a <br /> FRICTION L083 IN PIASTIC PIP� <br /> F1.OW RATE NOMINAL P1PE DIAMETER FLOW RATE OMINAI. PIPE DIAM�TER <br /> !N GPM 1.5 2 3 1N GPM 1.5 2 3 <br /> 2p 2.47 0.73 D.11 35 6.96 2,08 0•30 <br /> 25 g,73 1.11 0.18 4Q 8.91 2.84 0.38 <br /> 3p 5,23 1.55 0.23 45 11.07 3.28 0.48 <br /> Friction iass = 2.06 feet per 100 ft of pipe <br /> b. Determine tot�l pipe length from pump to discharge paint = 4p.t� <br /> Add 25% ta pipe tength above to accaunt for�itting loss � 50.0 „#eet pipe <br /> �. Calculate tatal friction foss by multiplying friction loss in ft/10Q B3a by <br /> equivafent pipe length B3b above = <br /> 2.06 X 50_00 equals 103.�0 / 100 = 1.0 ft head <br /> � <br /> C. Tota1 head required is the sum of the elevaiion differenca B1 plus additional pressure <br /> for the manifold B2 plus the totaf friction loss 3Bc. <br /> 10.0._ pius 5.0 plus 1.0 equals 16.0 ft total head <br /> D. The Pump requir�s 35.3 gpm and 16.0 feet of head <br /> PAGE 9 OF 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.