Laserfiche WebLink
remaining bare areas should be reseeded with an appropriate mix of native species(explained <br /> above). <br /> It also appears that some disturbance has occurred in the buffer of basin#2 due to construction <br /> activities(a driveway to the north of the basin). Once construction has been completed,areas <br /> disturbed within the buffer of basin#2 must be replaced by planting a mix of native grasses and <br /> forbs(see requirements for seed mix above). <br /> It was also noted that mowing may be occurring in the buffer,this is unacceptable per Division 3 <br /> Sec 78-1605(b). Mowing should be stopped in order for the buffer to establish proper <br /> vegetation that will increase the buffers filtering function. <br /> All silt fences should stay in place(outside of the wetland buffer)during construction activities to <br /> protect basin#2 from sediment. <br /> To ensure all are aware of wetland buffer boundaries(and for compliance check purposes)the <br /> boundaries should be accurately marked in the field and GPS locations outlining the wetland <br /> buffers should be submitted to the city in county coordinates. <br /> It is our recommendation that the city withhold an escrow in the amount of$4,850.00 for <br /> buckthorn removal and the native seeding. <br /> Page 2 ot 2 <br />