My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-003957 - drainfield/tank replace
Orono
>
Property Files
>
Street Address
>
S
>
Stubbs Bay Road North
>
400 Stubbs Bay Road North - 32-118-23-42-0001
>
Septic
>
1991-003957 - drainfield/tank replace
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:19 PM
Creation date
3/20/2019 11:38:26 AM
Metadata
Fields
Template:
x Address Old
House Number
400
Street Name
Stubbs Bay
Street Type
Road
Street Direction
North
Address
400 Stubbs Bay Road North
Document Type
Septic
PIN
3211823420001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: <br /> '/ . <br /> �' 3 �F��,�.:�,�^. <br /> ,� r•.-2o <br /> / MOUND DESZGN PROCEDURE , <br /> (For Flows up to 1200 �P��Continu�d) <br /> G.3. Calculate basal width ratio ' H.2.f. MulCiply. dike multiplicr hy <br /> by dividin� rock layer Z downs.lop�e mound d�eight to ge� <br /> loading rate of 1.20 gpd/ft downslope•"d'zice'�width; <br /> by allowable soil loading y 76X 3,� - �6.2 �t ` � <br /> rate; — <br /> 1.20 gpdi f t� = �gpd/f t2 = �, 0 g• Compare the values of step }i. 1 <br /> Check this value on page E-16, and sCep 11.2.f. Select tl�e <br /> greater of the two�valuc, as <br /> 4. Multiply basal widtti ratio by Clie downslopc dilce wicltli; <br /> rock layer width to get /6• 2 feet . <br /> required basal width; "' �. ,_ <br /> 2. 0 x /O f t �= 2 p f t h• Calcula'Ce �upsToPe dike wid th <br /> usin� upslope mound hci�ht <br /> H. Do�.�nslope Dike Sdidth and upslope dike multiplier <br /> 1. If landslope is 3% or more, -3 y� pag�, -18'��•-� f t <br /> -�L-- <br /> i. Total mound width is the sum <br /> subtract rock layer width of upslope dilce widtti plus rocl: <br /> from basal width to obtain layex, �.zidth plus downslope clike <br /> minimum downslope dike toe width width;� � <br /> Zo ft - /O ft = /Q ft /O. ,3 ft + lp ft +/�Zft =,�6, $ft <br /> 2. Calculate mound height at edge 3. If landslrs e��is''2,�9 ' ' <br /> oi rock layer on downslope side; P Percerie or <br /> less, basal. width i.ncludes betl� <br /> a . Determine d�pth of. �clean sand tlle upslope Zrid downslo1�e clil:c� <br /> i ill at upslope ed�e of rock widtl�s. <br /> layer: /. � feet <br /> b. *fultiply rock layer width by 1�. Calc,i�,l.ate do�anslope dike ea�icleli <br /> landslope to determine drop usin�; steps 11.2.a. Clirc>u1;h <br /> in elevation; i�•2.f; ' �feet ' � • <br /> /. D x � % = 100 = D. �f t b. Calculate upslope dike widtl� <br /> c. Add drop in elevation to depth usin� upslope mound lieigt�t rind <br /> of clean sand at upslope edge dike �mu�-t��lier 'f.�om Pafie �-18; <br /> of rock layer to get dep th of x f t = f t <br /> clean sand at downslope edge , c. Add downslopc dike width to <br /> of rock layer. upslope dike width to rock <br /> O.� f t + /, 0 f t = /. � f t layer wid th to ge l to ta 1 mound • <br /> d. Add depth of clean sand at down- width•. � <br /> slope edge to depth of rock ft�+ ft + [t = [c <br /> layer to depth of soil backfill —' <br /> to get mound •height at downslope �• Compare total mound width �c� <br /> edge of rock layer; required basal widt:h from scep <br /> /�ft +,75 ft +/.1Sft =3.Y ft G.4,. If tot�il mound width is <br /> � greater than requircd basal. <br /> e. Enter table on page E-18 with width, use ca.lculatecl dike <br /> landslope and downslope dike widths. If required 1��;>a.l <br /> ratio. Select dike multipli�r width is �;reater than eoc:�l <br /> of y 7 6 mound width, increase downslope <br /> Y' � f�O�F dike width... �' <br />
The URL can be used to link to this page
Your browser does not support the video tag.