My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01223 - new septic
Orono
>
Property Files
>
Street Address
>
S
>
Stubbs Bay Road North
>
385 Stubbs Bay Road North - 32-118-23-31-0001
>
Septic
>
2013-01223 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:40:22 PM
Creation date
3/20/2019 11:28:58 AM
Metadata
Fields
Template:
x Address Old
House Number
385
Street Name
Stubbs Bay
Street Type
Road
Street Direction
North
Address
385 Stubbs Bay Road North
Document Type
Septic
PIN
3211823310001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ' 3. ABSORPTION AREA SIZING <br /> Note:Mou�setbacks ore meawred from the A6sorpKon Area. <br /> A. Calculate Absorption HHdth:8ed Wfdth (2.6)X Mound Absorption Ratio (t.F)=Abwrption Width <br /> 10.0 ft X 2.0 = 20.0 ft <br /> B. For slopes>1%,the Absorption Width is meawred downhill from the upslope edge of the Bed. <br /> Calculate Downslope Abso►ptlon Width:Absorption Width (3.A)-8ed Width (2.B)=ft <br /> 20.0 ft - 10.0 ft = 10.0 ft <br /> 4. MOUND SIZING <br /> A. Calculate Cleun Sand Lift: 3 feet minus Depth to Limiting Condition (1.C)=Cleon Sand Lift (1 ft minimum) <br /> 3.0 ft - 1.7 ft = 1.3 ft Design Sand Lfft(optional): ��,3 <br /> B. Calculate Upslope Height:Clean Sand Lift (4.A)+�dia depth (1 ft.)+cover (t ft.)=Upslope Height <br /> 1.3 ft + 1.0 ft + 1.0 ft= 3.3 ft <br /> U•34:Sbpt Muftipiier TaQle <br /> Land Siope� Q 1 2 3 4 5 b T 8 4 10 11 12 13 14 t5' Ib 17 I8 19 10 tt 12 23 24 25 <br /> Upslo�le 3:1 3.UG 2.91 2.63 2.T5 2.h6 I.bt t.54 2.J8 2A2 236 231 2.Zb 2.tt 2.iT 2.13 2.C9 1.06 2.03 t.W 1.91 1.4i 1.43 t.9t t.84 t.&7 1.85 <br /> B?mt Ratio d:t a.W 3.85 3.70 3,5T 3.d5 3.33 323 3.12 3.93 2,9d 2,86 2.18 2,70 2.62 2.55 1.�8 2At L35 I.29 2,23 2.i8 2.13 2,Oi 2.03 1,9& 1.43 <br /> Land Slope b Q I 2 3 4 5 b 7 8 9 10 ll 12 13 I4 IS !6 17 18 19 20 21 II I3 24 25 <br /> G01•41510pP 3:1 I.�' 3.09 3.19 3.30 3.Jt 3.53 3.E� 3.8t! 3.95�.1{ a24 d.JB d.64 d.95 5.ta 5.55 5.88 5.23 b.63 1.W 7.4) 1.43 8.d2 8.9� 9.a6 10.02 <br /> BamRatio a:1 a.00 a.r7 a.35 3.5�J.76 5.D0 5.26 5.56 i.68 6.15 6,61 J.1a 7.69 B.29 8.92 9.57 t0.2a ID.9a n.67 11.a2 t3.19 i1.99 t�.82 �5.67 �6.5a 17,a� <br /> �. Select Upslope Berm Mu(tiplier <br /> (based on tand stope): 3.33 (figure D-34) <br /> D. Calculate llpslope Berm Wfdth:Multiplier (4.C)X Upslope Mound Height (4.6)=Upslope Berm Width <br /> 3.33 ft x 3.3 ft = 11.0 ft <br /> E. Calculate Drop in Elevntion Under Bed:Bed Width (2.6) X Lar►d Slope (1.D)=100=Dr� (ft) <br /> 10.0 h x 5.0 % + 100= 0.50 ft <br /> F. Catculate Downslope Mound Height:Upslope Height (4.6)+Orop in Elevation (4.E)=Downs(ope Hefght <br /> 3.3 ft + 0.50 ft = 3.8 ft <br /> G.Select Downslope Berm Multiplier <br /> (based on land slope): 5.00 {figure D-34) <br /> H.Calcutate Downslope Berm Width:Multiplier (4.G)X Dnwns(ope Neiqht (4.F)=Qownslope Berm Widtb <br /> 5.00 x 3.8 ft = 19.0 ft <br /> I. Calculate Minimum Berm to Crn�er Absorption Area:Dnwnslope Absorptfon Width (3.B or 3.C)+4 ft.=ft <br /> 10.0 ft + � ft = 14.0 ft <br /> J. Design Downstope Berm =greater of 4H and 41: 19.0 ft <br /> K. Select Ends(ope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Caicutate Endsl�e Berm (4.K)X Downslope Mound Height (4.F)=Endslope Berm Width <br /> 3.00 ft x 3.8 ft = 12.0 ft <br /> M.Catculate Mound Width:Upslope Berm Width(4.D)+Bed Widtb (2.6)+DoNmslope Berm Width (4.J)=ft <br /> 11.0 ft + 10.0 ft + 19.0 ft = 40.0 ft <br /> N. Catculate Mound Length:Endslope Berm Wfdth (4.L)+Bed Ler►gth (2.C)+Er►dslope Berm Width (4.L)=ft <br /> 12.0 ft + 38.0 ft + 12.0 ft = 62.0 ft <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.