Laserfiche WebLink
��o/�l <br /> . ��-o� <br /> CITY OF ORONO SEPTIC SYSTEM PERNIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,Mn 55323 <br /> � <br /> JOB STTE A.DDRESS �`�`� �5 � '-'�`J"'`� '����/ "�Cr �y <br /> Occupancy Type: Residential�_ Commercial Other <br /> Pei•mit Type: New or Replacement System $100.00 <br /> Repair Existing System $ 50.00 �C> �� <br /> (Tanks or Drain�ieid) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-c�esidentill permit fees <br /> O�mei's I�Tame:� � <<=k K� ����� Phone Number: <br /> Nl�iling Address: City: Zip: <br /> Conti•actor's Name: .�j� � �E iw►���� Phone Numbe�: ��.�-Y��i— `�o �� <br /> Mailing Address: j f o`i`J 1 ;��Gyv� /�-� City: ��i�+o�-Fr� Zip: ��5�?,�(� <br /> x** DO NO 1 1VIA� 1PA�Zi'IEN3'Z'v'Y�'H T�I'i[S AP�Li��.TIt)1>i*"�"� <br /> GENERAL INSTRUCTIONS <br /> l. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2, Permits will be issued only to contractors holdin� a Minnesota Pollution Control <br /> A�ency(NIl'CA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system desijn. Desijn reports <br /> are nat considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The followin� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rou�h up but prior to sand placement (sand �vill be jar tested for silt content), and again <br /> durin� pressure distribution pipin� installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are n.inctional and coinpiy wi�h codes. <br /> �. Individual holdinQ titPCAlnstallers License shall be present durin�all inspections. �i 2=�-�flesa• <br /> rnotice is a�equii•ed foc� all inspections. <br />