Laserfiche WebLink
---- ----- <br /> _,_O `� � <br /> � � ��.,. <br /> %1 ,,,, <br /> �;� O ,� <br /> `� : �' CITY of UIZONO► <br /> ±� , � f <br /> �,,J <br /> i', `'� �,,;;' Municipal Offices <br /> '�'�'�'+� ! �-. � <br /> ti, ;; <br /> ���,� � :<: ;' ,�G .'� Street Address: Mailing Address: <br /> • `q1�ESKpg' , 2750 Kelley Parkway P.O. Box 66 <br /> „-.-:__ .._ �= Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address � �� �%U�t�l�� ��j� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �,L <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes �L <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31,2010 <br /> Other . � <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> �— � �-]-O� . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes,this allows for proper cleaning. <br /> Comments: <br /> ,.��� � <br /> Inspector: Date of Inspection / v 'c�;� <br /> Telephone(952)249-4600 • Fax(9�2)249-4616 <br /> www.ci.orono.mn.us <br />