Laserfiche WebLink
Christine Mattson <br /> From: Jesse Struve <br /> Sent: Wednesday, July 31, 2013 4:23 PM <br /> To: Melanie Curtis; Christine Mattson <br /> Subject: 20130731 300 Stubbs Bay Rd#13-00637 <br /> Christine, <br /> I can approve the permit for 300 Stubbs Bay Rd but on the as-built survey they need to include the landscaping plans <br /> and all the top of wall (TW)and bottom of wall elevations (BW) on the plans. <br /> Also if the walls are installed over 4' in height or tiered walls are over 4' in height and are not separated by more than 2x <br /> the height of the walls, then the applicant will need to submit engineered plans and specifications signed by a registered <br /> professional engineer. <br /> Jesse Struve, PE <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952) 249-4661 - Direct <br /> (952) 249-4616- Fax <br /> www.ci.orono.mn.us <br /> � <br />