My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10094 - new structure
Orono
>
Property Files
>
Street Address
>
S
>
Stubbs Bay Road North
>
300 Stubbs Bay Road North - 32-118-23-42-0005
>
Permits/Inspections
>
2006-P10094 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:22 PM
Creation date
3/19/2019 1:12:36 PM
Metadata
Fields
Template:
x Address Old
House Number
300
Street Name
Stubbs Bay
Street Type
Road
Street Direction
North
Address
300 Stubbs Bay Road North
Document Type
Permits/Inspections
PIN
3211823420005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/'� <br /> M m ��nestroo <br /> � O 0 Rosene <br /> Anderlik& <br /> �Associates <br /> Engineers 6 Archite<ts <br /> Project Name: 300 Stubbs Bay Rd N Client: City of Orono <br /> To: Evelyn Turner, City Planner File No: 139-06-000 <br /> From: John Smyth, C.W.D., (651) 604-4708 Date: December6, 2006 <br /> Re: Buffer Violation <br /> Remarks: <br /> I reviewed the above referenced project site on December 6, 2006. The grading completed on-site extends into <br /> the buffer and was not completed as shown on the grading plan. As a result the existing buffer vegetation that <br /> was in place has been removed in a portion of the buffer that may be up to 0.4 acres in size. In order to be in <br /> compliance with the City Buffer Ordinance this area should be seeded with a native seed mix (recommend <br /> BWSR Mix U1) and blanketed with a straw blanket due to the slope. Site preparation, seeding and blanket <br /> installation is estimated to cost up to $5,900. Consultant compliance reviews may be $500.00. It is <br /> recommended that an escrow or letter of credit of$6,400 is held by the City until this work is completed. <br /> Due to the encroachment into the buffer it is recommended that monument and/or signage be installed on the <br /> upslope edge of the buffer so the property owner and contractors are aware of the buffer. The survey <br /> consultant that completed the grading plan that shows the upslope edge of the buffer will need to stake the <br /> upslope edge of the buffer in the field so the monument and/or signs can be located. <br /> Bonestroo, Rosene,Anderlik and Associates,Inc. www,bonestroo.com <br /> u St.Paul O�ce: ❑Milwaukee Office: ❑Rochester Office: �Willmar Office: u St.Cloud Office: ❑Grayslake Office: <br /> 2335 West Highway 36 1516 West Mequon Road 112 7`"Street NE 205 5th Street SW 3721 23r°Street S 888 East Belvidere Road <br /> St.Paul,MN 55113 Mequon,WI 53092 Rochester,MN 55906 Willmar,MN 56201 St.Cloud,MN 56301 Grayslake,IL 60030 <br /> Phone:651-636-4600 Phone:262-241-4466 Phone:507-282-2100 Phone:320-214-9557 Phone:320-251-4553 Phone:847-548-6774 <br /> Fax:651-636-1311 Fax:262-241-4901 Fax:507-282-3100 Fax:320-214-9458 Fax:320-251-6252 Fax:847-548-6979 <br />
The URL can be used to link to this page
Your browser does not support the video tag.