My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: wetland buffer
Orono
>
Property Files
>
Street Address
>
S
>
Stubbs Bay Road North
>
300 Stubbs Bay Road North - 32-118-23-42-0005
>
Correspondence
>
Re: wetland buffer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:41:24 PM
Creation date
3/19/2019 1:04:58 PM
Metadata
Fields
Template:
x Address Old
House Number
300
Street Name
Stubbs Bay
Street Type
Road
Street Direction
North
Address
300 Stubbs Bay Road North
Document Type
Correspondence
PIN
3211823420005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Bonestroo <br /> Mem o o Rosene <br /> Mderlik& <br /> �Assxiates <br /> � Englneers 6 Archltects <br /> Project Name: 300 Stubbs Bay Rd N � Client: City of Orono <br /> To: Evelyn Turner, City Planner File No: 139-06-000 <br /> From: John Smyth, C.W.D., (651) 604-4708 Date: December 6, 2006 <br /> Re: Buffer Violation <br /> Remarks: <br /> I reviewed the above referenced project site on December 6, 2006. The grading completed on-site extends into <br /> the buffer and was not completed as shown on the grading plan. As a result the existing buffer vegetation that <br /> was in place has been removed in a portion of the buffer that may be up to 0.4 acres in size. In order to be in <br /> compliance with the City Buffer Ordinance this area should be seeded with a native seed mix (recommend <br /> BWSR Mix U1) and blanketed with a straw blanket due to the slope. Site preparation, seeding and blanket <br /> installation is estimated to cost up to $5,900, Consultant compliance reviews may be $500.00. It is <br /> recommended that an escrow or letter of credit of$6,400 is held by the City until this work is completed. <br /> Due to the encroachment into the buffer it is recommended that monument and/or signage be installed on the <br /> upslope edge of the buffer so the property owner and contractors are aware of the buffer. The survey <br /> consultant that completed the grading plan that shows the upslope edge of the buffer will need to stake the <br /> upslope edge of the buffer in the field so the monument and/or signs can be located. <br /> Bonestroo, Rosene,Anderlik and Associafes, lnc. www.bonestroo.com <br /> ❑St.Paul Office: ��Milwaukee Office: ❑Rochester Office: �Willmar Office: u St.Cloud Office: �7 Grayslake Office: <br /> 2335 West Highway 36 1516 West Mequon Road 112 7`"Street NE 205 Sth Street SW 3721 23rtl Street S 888 East Belvidere Road <br /> St.Paul,MN 55113 Mequon,WI 53092 Rochester,MN 55906 Willmar,MN 56201 St.Cloud,MN 56301 Grayslake,IL 60030 <br /> Phone:651-636-4600 Phone:262-241-4466 Phone:507-282-2100 Phone:320-214-9557 Phone:320-251-4553 Phone:847-548-6774 <br /> Fax:651-636-1311 Fax:262-241-4901 Fax:507-282-3100 Fax;320-214-9458 Fax:320-251-6252 Fax:847-548-6979 <br />
The URL can be used to link to this page
Your browser does not support the video tag.