My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-18-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
03-18-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2019 9:25:48 AM
Creation date
3/19/2019 9:25:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
roof vents at rate per code <br /> asphalt shingles <br /> roof layover <br /> #15 felt trusses, hand-framing, <br /> 16"o.c. exist <br /> 24"o.c. <br /> ice 8.water shield 10/12 <br /> slope, <br /> tunnel chutes match verify <br /> exist <br /> truss <br /> 108 fascia,verify, heel] <br /> match exist hei.ht <br /> R38 insulation if it is not reduced <br /> anywhere in addition's attic <br /> 3/8"cedar <br /> plywood soffit, u u I <br /> verify,match east vapor retarder film <br /> 5/8"drywall <br /> continuous <br /> soffit vents <br /> over- I install flush beam,see <br /> hang 2nd floor plan <br /> lap siding to match exist 8'-1 1/8" <br /> housewrap verify,top of <br /> 1/2"wall 2 6sstuds,h16"hingo,c subflooroofwlltotop I EXISTING 2nd FLOOR <br /> R21 insulation I <br /> vapor retarder film <br /> 1/2"drywall <br /> I <br /> 3/4"subfloor <br /> R21 rim 7////7/77///// <br /> joist 11 7/8"1-joists,16"o.c. <br /> insulation n <br /> WINDOW NOTE: 5/8"drywall <br /> Verify make and model <br /> req'd to match exist. • <br /> Max U value=0.32. install flush beam,see <br /> Vendor to provide all a1.1 1st floor plan <br /> required tempered <br /> glass,fall protection, N 9'-1 1/d" <br /> egress hdwe,etc. `r verify,top of op <br /> subfloorto tEXISTING 1st FLOOR <br /> of wall <br /> R21 rim <br /> joist <br /> insulation <br /> PT 2x8 sill plate, <br /> overhanging 3/4"subf Ivor existing subfloor <br /> foundation wall 2"\ 'r <br /> Aar <br /> ""� <br /> 11 7/8"1=oists,16"o.c. existing floor'oists <br /> approx �1 5/8"drywall <br /> grade 001 <br /> NEW, 1 <br /> 1C-----____ remove wall portion,see 0 <br /> basement plan <br /> cover above grade portion of BASEMENT 1 <br /> insulation w/rolled FRP <br /> (NUDO Groundbreaker or EXISTING <br /> equal) 2x2 furring strips,16" 1 I EXISTING 0 <br /> "" <br /> o.c.,w/R5 rigid BASEMENT_ GARAGE <br /> 2"(R10)rigid insulation G� insulation between, <br /> cover w/1/2"drywall _ <br /> \� <br /> 12"concrete block,verify I I <br /> courses to match exist, <br /> verfy mod or non-mod ht I 3 12cora:slab coslab exist coni;slab <br /> 20"x 10"cont y approx f <br /> footing w/2#5s,cont 4"granular fill , grade <br /> JJJ <br /> stairs beyond <br /> /or <br /> i n <br /> cross section <br /> prelim 1-30-19 <br /> 3349 addition to sheet <br /> RichardGrohArchitects.com the Julie A9 <br /> scale is Crystal BayRoad, Lensing <br /> cell 612-554-9772 when printed on rY <br /> email groh2r@aol.com 11x17 sheet size Orono 55391 Residence of9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.