My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-18-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
03-18-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2019 9:25:48 AM
Creation date
3/19/2019 9:25:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
\ / <br /> \ II _ <br /> 1 , , I <br /> exist exists <br /> J exist I <br /> rid.d.e <br /> I , <br /> 11 11 <br /> I , I <br /> existing <br /> chimney <br /> , framing <br /> II <br /> r — — <br /> 11 <br /> , I <br /> I , 11 II <br /> I , II II <br /> I , II II <br /> II I � <br /> \ li II / <br /> L — — I I probable irder truss — — <br /> 11 II <br /> 1 <br /> II <br /> E sepe sxopeng--> <br /> 11 II <br /> existing <br /> I I m ridge to <br /> remainI I <br /> existing -xisnng existing <br /> I slope valley to valley to existing <br /> remai /remar slope <br /> II <br /> 1 existing existing <br /> ridge ridge i <br /> II II <br /> I I existing I I <br /> II slope <br /> II 1 \ I I <br /> II <br /> I I ne new I I <br /> I I valley new voile <br /> ridge , , <br /> II <br /> II , 1 <br /> —II <br /> 1 1 <br /> j <br /> /newroof <br /> , I <br /> , I <br /> I I new roof I , <br /> I , <br /> roof plan 11 11 <br /> , I <br /> prelim 1-30-19 <br /> T 3349 addition to sheet <br /> RichardGrohArchitects.com plan north J the Julie A4 <br /> cell 612-554-9772 scale islf4"=1'-0" Crystal Bay Road, Lensing <br /> whe"pshedon Residence of9 <br /> email groh2r@aol.com nxl7sheetsize Orono 55391 <br />
The URL can be used to link to this page
Your browser does not support the video tag.