My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P02965 - new septic
Orono
>
Property Files
>
Street Address
>
S
>
Stubbs Bay Road North
>
025 Stubbs Bay Road North - 32-118-23-34-0005
>
Septic
>
2000-P02965 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:40:52 PM
Creation date
3/18/2019 2:10:15 PM
Metadata
Fields
Template:
x Address Old
House Number
25
Street Name
Stubbs Bay
Street Type
Road
Street Direction
North
Address
25 Stubbs Bay Road North
Document Type
Septic
PIN
3211823340005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> * �7-P TESTING� ��C. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License#394 <br /> September 5, 2000 <br /> Dennis Krump <br /> 25 North Stubbs Bay Rd. <br /> Orono, Henn. Co., MN <br /> This site has an existing on-site sewage treatment system oonsisting of a cesspool & <br /> seepage pits and a small drainfield. The existing system is classified as failed under <br /> Minnesota Chapter 7080 rules. <br /> An addition is proposed for the existing house. This on-site sewage treatment system is <br /> designed for a Type 1, three bedroom home, in accordance with the Minnesota Pollution <br /> Control Agency Chapter 7080 and local ordinances. <br /> Approval wilt be needed from the City to be 10' from the North property line. This <br /> property line should be located prior to installation. <br /> The drainage pipe from the catch basin must be extended to outlet west of the mound. <br /> The pipe must be water tight and follow the north property line. <br /> The existing tanks will need to be abandoned, pumped and filled with soil. The new <br /> supply line will exit the house through the new addition. The existing supply line will <br /> need to be capped. <br /> The soils on this site are SCS soils mapped - LrC - lester loam. The seasonally <br /> saturated soils were located at 38" &42" (redox features). Due to the seasonally <br /> saturated soils, a Pressurized Mound System will need to be instatled to treat septic <br /> effluent. The bottom of the rock must be located at teast 3' above the saturated soils. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.