Laserfiche WebLink
' � Builder Acknowledgement Form <br /> Permit #2017-01232 / 739 Stonebay Drive <br /> � ,, ; <br /> Builder Representative Name: � P ; `� i �^� �'�� ' <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection, a ,-� � _... <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order ` <br /> will be issued. �'� � <br /> Schedule a minimum of one hour for the framing inspection. .`� <br /> �, , <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land ,>> � — <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to ' ,�� <br /> inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must ' <br /> remain until vegetation has been established. �� ' <br /> ; <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to -- <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning � : <br /> and repair of roadways for any adverse impacts. <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations � <br /> must be submitted and approved. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios, grading, sidewalks, retaining , . –� <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a <br /> �: <br /> separate Zoning Permit application to be submitted and approved prior to the work <br /> commencing. � <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the � � �' <br /> height of the lower wall require engineered plans and a building permit to be submitted and � <br /> approved prior to construction. <br /> � <br /> w:\street files\stonebay dr\739\builder acknowledgement form 2017-01232.docx <br />