Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Thursday, October 05, 2017 5:11 PM <br /> To: Christine Mattson <br /> Subject: RE:737 Stonebay Drive/#2017-01233 <br /> Chris, <br /> I've reviewed the subject plan and stamped approved. <br /> 1. Perimeter sediment control measures should be installed by the Contractor and inspected by the City prior to <br /> any work, including demolition.Contractor must provide minimum 24 hour notice prior to inspection. <br /> 2. Separate utility permits will be required for the sewer and water connections. <br /> Adam <br /> From:Christine Mattson <br /> Sent: Monday,October 02,20171:58 PM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us>; Roger Peitso<rpeitso@ci.orono.mn.us> <br /> Subject:737 Stonebay Drive/#2017-01233 <br /> We received a building permit application for 737 Stonebay Drive. I have noted the survey should include the proposed <br /> retaining wall shown on the building plans including top and bottom wall elevations. <br /> Please review and provide comments. <br /> Thank you! <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway � Orono � MN � 55356(physica/address) <br /> PO Box 66 I Crystal Bay � MN I 55323-0066(mailing addressJ <br /> '� 952.249.4620 { 8 952.249.4616 <br /> �cmattson@ci.orono.mn.us � �www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: November 10,2017 <br /> 1 <br />