My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01233 - new structure
Orono
>
Property Files
>
Street Address
>
S
>
Stonebay Drive
>
737 Stonebay Drive - 33-118-23-11-0070
>
Permits/Inspections
>
2017-01233 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:44:21 PM
Creation date
3/18/2019 12:56:26 PM
Metadata
Fields
Template:
x Address Old
House Number
737
Street Name
Stonebay
Street Type
Drive
Address
737 Stonebay Drive
Document Type
Permits/Inspections
PIN
3311823110070
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Builder Acknowledgement Form <br /> Permit #2017-01233 / 737 Stonebay Drive <br /> , <br /> � ,� _ � <br /> � , <br /> ! ;:_ <br /> Builder Representative Name: �- '' t � � i <'�� � ;; ,r' f <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection, a ° i -- <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order <br /> � <br /> will be issued. <br /> Schedule a minimum of one hour for the framing inspection. _ ' ! ^ <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to � ' v <br /> inspection. � ` , <br /> Erosion control shall be installed and maintained throughout the entire project and must , ,�? ,:` <br /> remain until vegetation has been established. % <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to � ,-- <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning :- , - <br /> and repair of roadways for any adverse impacts. <br /> r. <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations � <br /> must be submitted and approved. <br /> t` <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios, grading, sidewalks, retaining , <br /> ,--.. <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a : _ <br /> r. : : <br /> separate Zoning Permit application to be submitted and approved prior to the work r� <br /> commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the � ,,-- <br /> height of the lower wall require engineered plans and a building permit to be submitted and �,:' �;�- <br /> approved prior to construction. <br /> w:\street files\stonebay dr\737\builder acknowledgement form 2017-01233.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.