Laserfiche WebLink
, PLAN R�VIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> bddress: `RL�1 J� � ��/�1�� �,��1'VC�I� Permit No.: �0� ���6 <br /> Description of work: �V � Date Rec'd: ( � •�5 ' �J <br /> �/ <br /> Septic review by: Date Approved: �z, L � <br /> Zoning review by: Date Approved: � L • �,��� <br /> Building review by: � Date Approved: � � <br /> Grading review by: �� __ Date Approved: �� ����5 <br /> Zoning District: R1�—� � Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: Z. S AC Width: Lot Coverage: SF % <br /> Survey Submitted: �s � No Date of Survey: �I' �0' � Revised date(?): � ! � ! � �� <br /> Landscape plan submitted? �Yes � No Landscaper: 1 rC- �I�[�].U�� <br /> / <br /> Pro osed Setbacks: <br /> Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> C"�) �1 <br /> De,fined Height: Peak Height: FFE:�iQ��O FFE minus 6 feet= � �. '���(Existing Contour) <br /> 1� � - <br /> Perimeter(linear feet)_ � � 50%_ ��'.� � , `-- i '...�J'�.F. below grade o� ����G�L� <br /> Basement? �'fes � No, 2 Stories <br /> �'�.,�4� :� �'�"����,� , ��� <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the lowest proposed Slab at or above grade— • <br /> START WITH floor(of the basement or crawl space)and measure from hiahest existino <br /> the highest point of the roof. START W ITH rA ade to the highest point of the <br /> i , ,;1� roof even if fill was brought in to <br /> elevate home. <br /> If you have a... <br /> SUBTRACTION • GABLE OR HIPPED ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtract half the distance from highest existfng grade to the <br /> ROOF TYPE) between the highest point of the roof hi hest ofnt of the roof. <br /> to the low point of the corcesponding If you have a... <br /> � gable or hipped roof SUBTRACTION ' GABLE OR HIPPED ROOF <br /> ' • GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> windows): Subtract half the distance ROOF TYPE) the distance between the <br /> between the top of the highest highest point of the roof to <br /> window and the highest point of the the low point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, • GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> � SUBTRACTION Subtract the distance between the half the distance between <br /> J�,��� (BASED ON basemenUcrawl space floor and the the top of the highest <br /> EXISTING highest existing grade adjacent to the wfndow and the highest <br /> GRADES) foundation OR 10 feet(whichever is less). point of the roof <br /> �I ' �,V, • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> �� EQUALS Defined building hefght subtraction. <br /> � _ Defined building height <br /> � EQUALS <br /> �'��, �.. <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />