My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01430 - new structure
Orono
>
Property Files
>
Street Address
>
S
>
Saint Andrews Street
>
4645 St. Andrews Street - 06-117-23-31-0011
>
Permits/Inspections
>
2015-01430 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:15:14 PM
Creation date
3/14/2019 11:50:45 AM
Metadata
Fields
Template:
x Address Old
Address
4645 St. Andrews St
Document Type
Permits/Inspections
PIN
0611723310011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Christine Mattson <br /> �h.�����- ���� ,�`�t��� <br /> From: Christine Mattson <br /> Sent: Friday, November 13, 2015 1:37 PM <br /> To: 'Curt Swanson' <br /> Cc: Roger Peitso; Melanie Curtis; pemberton@sathre.com <br /> Subject: 4645 St. Andrews Street/#2015-01430 <br /> curt, <br /> We have performed a cursory review of the survey for 4645 St.Andrews Street and request the survey be updated <br /> based on the following comments: <br /> 1. Show First Floor Elevation (FFE). My calculation shows the FFE to be 960.6',yet the basement calculation <br /> provided on the survey indicates the contour used to determine basement compliance was 961.0', please clarify <br /> and show the elevation being used for the basement calculation on the survey. <br /> 2. My calculations of the perimeter do not match what is shown on the survey. I show the foundation perimeter is <br /> 302.60 linear feet,excluding the unexcavated areas(garage and stoop). Please clarify. <br /> 3. Top of Foundation Elevation (TOF) is noted on the survey. Please show the spot on the foundation where this <br /> elevation is in reference to. This same spot/location should correspond when the foundation as-built survey is <br /> submitted for approval. <br /> 4. The survey is difficult to read,was it to be printed in color? The existing and proposed contours are difficult to <br /> differentiate. <br /> 5. Please shown the rock bed areas within the septic sites for setback determination. These areas should be staked <br /> in the field. <br /> 6. The driveway is shown as"conceptual only". Please show the final proposed driveway location. <br /> Please note,our engineer has not reviewed this survey so there may be additional comments forthcoming. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono I MN � 55356(physica/addressJ <br /> PO Box 66 � Crystal Bay � MN I 55323-0066(mailing addressJ <br /> 'a' 952.249.4620 I 8 952.249.4616 <br /> �cmattson@ci.orono.mn.us � � www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE W/LL BE CLOSED: Wednesday, November 11,2015 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.