Laserfiche WebLink
3. The top of foundation elevation is referenced on the survey. Please have the surveyor show on the perimeter of <br /> the foundation the location the top of foundation elevation is in reference to. We expect this same referenced <br /> location to be used on the foundation as-built survey. <br /> Also,for your application to be considered complete and for our review to continue, please submit: <br /> 4. Landscape Plan. Prior to the issuance of the building permit a landscape plan must be submitted showing all the <br /> proposed exterior/landscaping improvements, i.e. patios,grading,sidewalks, retaining walls,etc. The plan should <br /> include the name of the individual performing the work. The landscape plan should match what is shown on the <br /> survey. <br /> 5. Minnehaha Creek Watershed District (MCWD). Your project may trigger the Minnehaha Creek Watershed District's <br /> (MCWDs) permitting requirements; please contact the MCWD directly at 952-471-0590 regarding your project. Please <br /> note,the City of Orono will not issue a building permit without a copy of the MCWD permit or documentation stating <br /> the proposed project does not trigger any of their permitting requirements. <br /> Please don't hesitate to contact me if you have any questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway � Orono � MN � 55356(physical addressJ <br /> PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ <br /> '� 952.249.4620 � g 952.249.4616 <br /> � cmattson@ci.orono.mn.us � � www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: Thursday& Friday, November 26&27,2015 <br /> Thursday& Friday, December 24&25,2015 <br /> Friday,January 1,2016 <br /> 2 <br />