Laserfiche WebLink
Page 1 of 1 <br /> Lyle Oman '��'<� <br /> ___» ��.._________._�__________._�___._.____________________._._�__.__.__�___._________�_.�.�____._.__�_�__.----- - <br /> From: Jeffrey P. Gustafson [Jeff@StonewoodDesignBuild.com] � <br /> ��'��,�,,,� <br /> Sent: Wednesday, November 23, 2005 3:38 PM �� <br /> To: Lyle Oman <br /> Subject: 4203 North Shore Drive & 1280 Spruce Place <br /> li. <br /> lappy Turkey Day± <br /> 203_North_Sh_ore__Driv_e. <br /> )n Wed before Thanksgiving we graded a berm along the Easterly property line which considerably cut down the amount of water <br /> �at flows from our property toward the neighbor. We left the 30 feet of easement area level at this time pending ttie Excel Energy <br /> �enching across this area on Monday after Thanksgiving. We will berm this 30 foot wide area as well after the trenching. The <br /> �eighbor will have no reason to not agree that less water comes onto her property than before our demolition (frorn her Westerly <br /> �eighbor). As additional fill becomes available to us we will soften the berming between it's current ridge and our driveway in a <br /> nanner which leaves the drainage directions the way it now is. <br /> understand that Tom Kellogg will return to our site on his own accord within a week or so to view the progress; which will only <br /> ielp the process for us. His ideas have always been welcome and helpful to us. <br /> �andy Stern is close to delivering the legal description for the utility easement that I have committed to granting to Orono and the <br /> Jtility Companies. Excel is trenching electric, telephone, and cable lines across this area next Monday to service the Westerly <br /> ieighbor. <br /> met the neighbor to the West, who said that she was happy with our grading and clearing out of the 'junkyard' (as she referred to <br /> t as) along our common property line with her. She said she felt our property has been neglected for years. She even offered to <br /> speed up the painting of her garage, etc. to help improve the entire common situation. <br /> 1280_$_pruce_._Place. ���� � <br /> �Ve actually got the electric and natural gas lines in, and got the landscaping along the Northerly property line somewhat roughed <br /> in. We ran some drain tile along the property line, and graded the common line toward the Lake with a partial rock `wash' in part of <br /> it, and a substantially deep swale in our rear yard cutting around the mature trees along the Lakeshore area to prevent having to <br /> remove any trees. I feel it should work. Ms. Anderson told me recently that earlier this year she had sor�e r�oisture on the block in <br /> her lower fevel for the first time. Hopefully this was due to the water blockage along the line from the construction erosion fencing <br /> and hav bale debris. She does have two downspouts from her roof gutters dump int� the common property line area. This water <br /> i___i.. ._...;a c....;.,,. <br /> should for the most part be accommodated as well into our dralnage swaie. vVe wiii moniior inis siivaiio�� c���C�y ��C�� �N����y <br /> although we feel it will work out well. We regret that we missed our targeted sodding this fall, although we got most of the grading <br /> accomplished and Lakeshore Rip-Rap installation. <br /> Thank you for allowing us the ample time to have our projects professionally scheduled and graded. <br /> Spruce Place wil� be completed this December with final landscaping next May. <br /> North Shore Drive is scheduled for an early June, 2006 total completion. <br /> Very truly yours, <br /> Jeffrey Gustaison <br /> Cell 612-964-0015 <br /> � �i�u;�nr�, � <br />