Laserfiche WebLink
, . Builder Acknowledgement Form <br /> Permit #2016-015 5/ 1280 Spruce PI <br /> Builder Representative Name: , x �� <br /> Permit Conditions: Initials <br /> / <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection,a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order <br /> will be issued. <br /> Schedule a minimum of one hour for the framing inspection. <br /> The proposed plan was annotated by the City's Engineer to indicate perimeter erosion control <br /> measures. Erosion control measures must be installed by the Contractor and inspected by the <br /> City prior to any land disturbing activities. The contractor must provide a minimum of a 24 <br /> hour notice prior to inspection. <br /> Erosion control measures shall be maintained throughout the entire project and must remain <br /> until vegetation has been established. <br /> The project results in 14.919'a structural coverage.An as-built survey shall be submitted to <br /> confirm conformance with structural coverage(159'0)and hardcover(25�0) limitations. <br /> No underground sewer within 20 feet of well. '� <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover <br /> calculations must be submitted and approved. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, <br /> retaining walls,etc. not currently shown on the approved survey will require a separate Zoning <br /> Permit application and landscape plan to be submitted and approved prior to the work <br /> commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the <br /> height of the lower wall require engineered plans and a building permit to be submitted and <br /> approved rp ior to construction. <br /> w:\street files\spruce place\1280\builder acknowledgement 2016-01575.docx <br />