My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P08438 - demo
Orono
>
Property Files
>
Street Address
>
S
>
Spruce Place
>
1280 Spruce Place - 08-117-23-32-0027
>
Permits/Inspections
>
2005-P08438 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:44:09 PM
Creation date
3/11/2019 2:35:09 PM
Metadata
Fields
Template:
x Address Old
House Number
1280
Street Name
Spruce
Street Type
Place
Address
1280 Spruce Pl
Document Type
Permits/Inspections
PIN
0811723320027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a , <br /> 7. Within 5 working days of superstructure removal,a final inspection shall be requested. The <br /> site shall be teft clean and clear of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation (except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 8. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses,including attorney fees,against the City,its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> 9. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks must <br /> be pumped,crushed and filled with native soils. An inspection is required after the tanks are <br /> pumped and before the tanks are crushed and filled. <br /> PERMIT TYPE AND FEE CALCULATION <br /> � $50.00 -Principal Structure <br /> __�_ $30.00-Accessory Structure <br /> 1. Subtotal of above permit requested $ �0.0� <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ �O.5a <br /> The undersigned hereby applies to the City of Orono for issuance of a Demolition Permit,agrees to <br /> do all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and certifies that all statements made on this application are complete,true and correct. <br /> S�td N�-�'w vs��,� 'Q w���.� �,��. <br /> APPLICANT'S SIGNATURE: Date: �— �'��� � <br /> OWNER'S SIGNATURE: Date: � — Z �' � � <br /> APPROVED BY: � Date: Z• � 'a S <br /> ,rl , ,'y� �,� <br /> � 'I <br />
The URL can be used to link to this page
Your browser does not support the video tag.