My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00780 - septic
Orono
>
Property Files
>
Street Address
>
S
>
Spring Hill Road
>
1135 Spring HIll Road - 26-118-23-43-0006
>
Septic
>
2017-00780 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:02 PM
Creation date
3/7/2019 1:09:43 PM
Metadata
Fields
Template:
x Address Old
House Number
1135
Street Name
Spring Hill
Street Type
Road
Address
1135 Spring Hill Road
Document Type
Septic
PIN
2611823430006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, , 5. DISTRiBUTION MEDiA: REGISTERED 7REATMENT PRODUCTS:LHAMBERS AND EZFLOW <br /> , • d, Enter Dispersal Media: <br /> B. Enterthe Component: Length: �ft Width:�ft Depth:��ft <br /> C. Number of Componenis per Row= Bed Length divrded by Component Length(Raund up) <br /> � ft : r.� ft= ��components/row <br /> U. Actual Bed Length= Number of Componenislrow X Companent Length: <br /> �compo�ents X �ft = �ft <br /> E. Number of Rows= Bed Width divided by Component width(Rou�d up) <br /> � ft: � ft= �rows Adjusi width so this is an whole number. <br /> F. Tota!Number of Components=Number of Comporrents per Row X Number of Rows <br /> � X �� _ �_�components <br /> 6. MOUND SIZlNG <br /> A. Calcutate Minimtam Clean Sand lift: 3 teet minus Depth to Limiting Condiiion =Clean Sand Lift <br /> 3.0 ft - 2.0 ft = 1.0 ft Uesign 5and tift�optiona!): �ft <br /> e, Calculate Upslope Heighi:Ctean Sand lift + media depth+cover(t ft.)= Upstope Height <br /> i.o rc = 0.8 fc * a.o fc= z.s rc <br /> C. Seleci Upslope Berm MulLiplier�based on land siope►: 2.36 <br /> land Slope� 0 1 2 3 � 5 b 7 S 9 IO 11 12 <br /> Unslope Serm 3:1 3.Q0 2,91 2.$3 2.75 2.68 2.61 2.54 2,4� 2.42 2.36 2.31 2.z6 2.21 <br /> Ratic 4:1 4.Q0 3.85 3.10 3.57 3.�5 3.33 3.23 3.I2 3.D3 2.94 �.$6 2.78 2.70 <br /> D. Calcuta[e Upslope Betm W�dth:Multiptier X Upslope Mound Height = Upstope Berm Width <br /> 2.35 ft X 2.8 tt = 6.5 ft <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X tand Slope= 10U= Drop(R) <br /> i0.0 ft X 10.0 :� : 1Q0= 1.00 ft <br /> f. Calculate Downslope,N,ound Neight: Upslope Height{ Drop in Elevation = Downsiope Height <br /> 2.8 ft + 1.00 fi = 3.8 tt <br /> G. Setect D+ownslope Be�m Multiplier(based on land siope): 4.29 <br /> land Stope g'a 0 1 2 3 4 5 5 7 8 9 10 il 12 <br /> �cwnsivs�e 3:1 3.t�0 3A3 3.F� 3.3C 3.a1 3.53 3.06 3.8U 3.95 4.11 G.15 �.Gg 4.69 <br /> Berrn Ratio 4:1 �.p0 �.17 4.35 Q.SA 4.76 S.Od 5.26 5.56 5.$8 6.25 b.67 7.14 7.69 <br /> H. Caiculate Downslope Berm Width:l�uttiptier X Downslope Heigfit = Uownslope Serm Width <br /> 4.29 x 3.8 ft = ib.i ft <br /> i. Calcutate Min�mum Berm to Cover Absorption Area: Downslope Absarption Width +4 feet <br /> �ft +� . I ft = 4A ft <br /> J. pesign Downslape Berm=greaier of 4N and 41: 76.1 ft <br /> K. Sete�ct Endslope Berm Multiplier: 4.Q0 (usuatty 3.0 or 4.0) <br /> L. Caiculate Endslope Berm X t3ownslope�Vtound Height = Endslope 8erm Width <br /> 4.00 ft X 3.8 ft = 9 S.0 it <br /> M.Calcutate N�ound Width: Upstope Berm Width+Bed Width + Downslope Berm W�dtf� <br /> G.� �1 + 10.0 Tt + �6.7 ft = 31.6 ft <br /> N. CalculateN,ound Length: Endslope Berm Width �8ed Length • Endslope Berm Width <br /> 15.0 ft + 62.5 ft + 15.0 ft = 92.5 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.