My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00155 - in-ground pool
Orono
>
Property Files
>
Street Address
>
S
>
Spring Hill Road
>
1025 Spring Hill Road - 26-118-23-43-0005
>
Permits/Inspections
>
2016-00155 - in-ground pool
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:18:59 PM
Creation date
3/7/2019 12:14:05 PM
Metadata
Fields
Template:
x Address Old
House Number
1025
Street Name
Spring Hill
Street Type
Road
Address
1025 Spring Hill Road
Document Type
Permits/Inspections
PIN
2611823430005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, - _ _ . __ N.f�J[?2 <br /> . <br /> , , I <br /> • PERIMETER D�FLEC7'10 TEST � <br /> The pertmeter deflectbn est was conducted an bot� Caver-pool satety covers in <br /> accordanGe with section 9. of ASTM E8 y3, ith a 50 Ib, weight placed 4' from the <br /> edge of the pooi on top of � satety cover, the test ob�ect was ttnable to pass through <br /> any apenfng at thQ pertm ter a� the p� � � �eC_P�� �j$�, covers met the <br /> performance requirements or!he perimet�r de ectlon test as outlinect in AST'M ES 13 <br /> secHon 7.2. <br /> SURFACE DRAINAGE TE 7 <br /> On June 12. 1990, the su ce drainage test w s conducted on a Cover-Pool safety <br /> cover whkh was lnstetled o a locaf �rhrate po . The tracking system was an under <br /> track system. The pool d nsfons were 14.17' ax.5'. The surface dralnage test was <br /> conducted In accardance AS'�M ES 19 sect an 9.3. Wafer was applied evenly at <br /> a rate of 11.7 gpm per 9000 sq, ft, A amall s�m pump, wfth dfschar�ge capacJty ot 20 <br /> gpm� was ptaced at ane en of the satety cove with the discharge hosc3 snaktng the <br /> (ength of the p�ol, on top of e s�fety cover, a d�scttarging at the opposite end irom <br /> the �ump, The water was a p((ed for 30 minut with the pump on and fn place. The <br /> water wa� then shut aff and e pump was aqow to run for an addittonal 30 minutes. <br /> Ths tesi mannequln (7immy was then placed u on the sa/ety cover. At the end of 3 <br /> minutes atter placing 77m upon the satety ver, an unsafs amount of watec as <br /> described in ASTM ES '13 s bn 8,3,'I dtd not e st. The Cover-Ponl safety cover met <br /> the safety requtrernents as o t(ined in AS'fM ES 3 sectton 7.3. <br /> All s�fety covers and equipment test d were stendard as provided by Cover-pools �nc, Safety covers <br /> were �nstalled acc;ording to Cover-Pd fs, 1nc. standard in tallation c�iterta. <br /> Inspector. Jerry Hatf <br /> Kaui.ri ,vn�aa a+�r m�.s�er�a wne.Yesra�. <br /> �� r►ar e�annaouc:o,iocceir N ru�.,N+aavr <br /> +MatTr� w rm.wc. <br /> � Reapea upy suMnflt�d, <br /> Proless wwl Servlai lndualrl�s, Inc. <br /> Jorry O.H�d <br /> tkpsi eM Manager <br /> � � <br /> - TOTAL P.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.