My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01444 - addn/remodel
Orono
>
Property Files
>
Street Address
>
S
>
Spring Hill Road
>
1025 Spring Hill Road - 26-118-23-43-0005
>
Permits/Inspections
>
2015-01444 - addn/remodel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:18:58 PM
Creation date
3/7/2019 12:08:06 PM
Metadata
Fields
Template:
x Address Old
House Number
1025
Street Name
Spring Hill
Street Type
Road
Address
1025 Spring Hill Road
Document Type
Permits/Inspections
PIN
2611823430005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� a <br /> Christine Mattson <br /> From: Christine Mattson � <br /> Sent: Wednesday, November 25, 2015 8:44 AM <br /> To: 'dan@kuhldesignbuild.com' <br /> Cc: 'jbowlsby@msn.com'; Roger Peitso; Melanie Curtis <br /> Subject: 1025 Spring Hill Road/#2015-01444 <br /> Attachments: Survey Requirements-August 2015.pdf; Swimming Pool Building Permit Application-August <br /> 2015.pdf; Demolotion Permit-07-2015 New Surcharge Fee.pdf; escrow agreement.pdf <br /> Dan, <br /> We have performed a cursory review of the building permit application for 1025 Spring Hill Road. Please submit or <br /> revise the following so we may continue our review: <br /> 1. Certificate of Survey. A survey dated 11-17-2015 was provided; however, it does not fully show current topography <br /> around the proposed addition or any proposed grading for the additions or the pool. Please provide two copies of an <br /> updated full-size certificate of survey which meets all of the City's survey standards(enclosed)indicating any proposed <br /> grading. Please note our engineer has not reviewed the survey,so additional comments may be forthcoming. <br /> 2. Demolition Permit. We understand the octagon structure will be demolished after the building permit is issued and in <br /> conjunction with the construction of the new addition. If the octagon is to be demolished prior to the building permit <br /> being issued, please submit a demolition permit(copy attached). <br /> 3. Pool Permit. <br /> a. Is the pool being constructed at this time? If so,please have the pool contractor submit a separate pool permit <br /> (copy attached). If not,we will redline the pool with the building permit for the additions only. <br /> b. If the pool is proposed to be constructed at a later date,have the pool contractor submit pool permit with two <br /> copies of the survey showing the proposed pool location,existing and proposed topography at that time. <br /> 4. Resolutions. Please arrange for both John and Cyndy to sign the original resolutions at the City Offices. We are open <br /> Monday through Friday 8 am to 4:30 pm. We will not issue the building permit until the resolutions have been signed. <br /> 5. Escrow&Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal of an <br /> escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City for out-of- <br /> pocket costs incurred during the review of your plans. Additionally this escrow will guarantee conformance with City <br /> Code Chapter 79 relating to erosion control and stormwater. The required escrow amount for this project is <br /> $2,500. We currently hold $2,500 in conjunction with the variance application. No additional escrow money is <br /> required at this time. An updated escrow agreement is attached. The property owner must sign the updated escrow <br /> agreement and return. <br /> 6. Minnehaha Creek Watershed District (MCWD). Your project may trigger the Minnehaha Creek Watershed District's <br /> (MCWDs)permitting requirements;please contact the MCWD directly at 952-471-0590 regarding your project. Please <br /> note,the City of Orono will not issue a building permit without a copy of the MCWD permit or documentation stating <br /> the proposed project does not trigger any of their permitting requirements. <br /> Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on the above <br /> requirements. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono I MN � 55356(physica/address) <br /> PO Box 66 � Crystal Bay I MN I 55323-0066(mailing addressJ <br /> '� 952.249.4620 � 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � � www.ci.orono.mn.us <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.