My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info/including 1997 design
Orono
>
Property Files
>
Street Address
>
S
>
Spring Hill Road
>
1025 Spring Hill Road - 26-118-23-43-0005
>
Septic
>
septic info/including 1997 design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:00 PM
Creation date
3/7/2019 11:54:24 AM
Metadata
Fields
Template:
x Address Old
House Number
1025
Street Name
Spring Hill
Street Type
Road
Address
1025 Spring Hill Road
Document Type
Septic
PIN
2611823430005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ' F-17 <br /> � Pi�iP SELECTTON PRO ED mF � <br /> a <br /> FTD PERFORA710N OF � PERFORITED L-TERaI <br /> .�. Determine pump capadty: `�� <br /> Gravity Distribution r- <br /> 1_ Minimum suggested is 600 gallons per hour(10 gpm)to stay ahead of T� <br /> ��/pf IA Gw1�ftY�O�`K fv�/� <br /> Wd�1152 Ta�. ':-las��Ser�pv' rri M�M rr�a�w rw..� <br /> .' .M w�rww�+�/ <br /> ? Maximum suggested for delivery to a drop box of a home system is 2,700 �..+.,.��,o,.�..,,.,,.,,p,. <br /> S�lons r hour(45 m)to revent build-u of ressure in dro box. , ~~`•`r~"` '~ <br /> Pe SP P P P P ti-.,.. . .,U.. �:•�.��„ <br /> N q�yn tq„� <br /> Pressure Distibution : . • . 'r'�"����« <br /> ; . CM�S��VR h�rw d 4�rv <br /> 3.a. Select number of perforated laterals 3 ' <br /> b. Select perforation spacing- �feet ��•y,���. <br /> c Sub/trfa �2 ft from the rock layer length. <br /> ��-2 ft.= S'z feet <br /> d. Deternune the number of spaces between perforations. <br /> Length perf.spacing=�ft.+�ft._�spaces <br /> e. �spaces+1 =��perforationsllateral ��P�a�nD�sch�` <br /> gallcns pet atinute(gpmj' <br /> f get totPal n emberr of peo rations�b�umber�f laterals to erforations��� �d e '�2�'�` i•�R'' <br /> .�.�,. �-�_-�_P c� <br /> g• � X '�P,,= '-�� 8P�• . <br /> 1.Oa 0.56 0.74 <br /> SELECTED PUMP CAPACITY��BPai 2.OI� 0.80 I.O4 <br /> B.Determine head requirements: <br /> 1- Elevation difference between pump and point of discharge. a.Use for single family homes <br /> .�_feet b.Use for all other applications <br /> � 2. If pumping to a pressure distribution system,�ive feet for pressure <br /> requimd at manifold if gravity s�stem,zero. <br /> S feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. P;pe L,eng�, <br /> Read hiction loss in feet per 100 feet from table. ' � <br /> F.L= �.Vu ft./100 ft of pipe Poinc of Dixhm <br /> T�o� <br /> b. Determine total pipe length from pump to discharge pevaaon Differrnce I <br /> point Add 25 percent to pipe length for fitting � ��� <br /> loss,or use a fitting loss chart. Equivalent pipe p <br /> length-1.25 times pipe length= <br /> /3 S x 1.25= J��i feet F-18b <br /> c. Calclilate total friction loss by multiplying 1S inch 2.0 inch 3.0 inch <br /> � Friaim los�per loo a ot pipe <br /> friction loss in h/100 ft by equivalent pipe length. <br /> Total friction loss= L�-I x /la 9 +100=�_feet 10 0.69 0.20 <br /> 4• Total head r uired is the sum of elevation difference, 12 0.% 0.28 <br /> . � 14 1.28 0.38 <br /> special head requirements,and total fricdon loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> ►y + � + � 20 2a� 0.�3 0.i i <br /> u s.�3 i.ii o.ib <br /> �1� (2) (3c) 30 5.23 1S5 0.23 <br /> 35 7.90 2.06 0.30 <br /> TOTAL HFAD �-�_feet • � 11.07 2.64 0.39 <br /> 45 14.73 3.28 0.48 <br /> 50 3.99 0.58 <br /> G Pump selection ss a.�6 0.�0 <br /> �o s.�o o.s2 <br /> � 1. A pump must be selected to deliver at least <br /> �_gpm (Step A) with at least �4 feet of total head (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.