Laserfiche WebLink
. WINSTON ADbITION - COM.�9001 PAGE 26 OF 32 <br /> ' EXTERIOR FINISH MATERIALS <br /> SIDING FOR THE ADDITION SHALL BE EXISTING T�G SOUARE JOINT CEDAR <br /> ' VERTICAL BOARDS WHICH ARE TO BE REMOVED FROM THE WALLS ON THE NORTH <br /> AND WEST EXTERtOR WALLS UNDER THE WINDOWS OT THE EXISTiNG HOUSE <br /> LIVING ROOM. FURNISH AND INSTALL NEW VERTICAL BOARDS TO MATCH ON <br /> ' THE AREAS WHERE THE EXISTING BOARDS ARE REMOVEO. <br /> THE SOFFIT SHALL BE 3I4 INCH MDO EXTERIOR PLYWOOD. <br /> � THE SIDING UNDER THE 'CASEMENTS WINDOWS. ON THE EAST WALL OF.�THE RE- <br /> CESS AT THE WEST SIDE OF THE PATIO �OOR, ON THE ENOS OF THE PROJECT- <br /> ING SILLS AND THE PROJECTING SIILS SHALL BE 3I4 INCH MDO EXTERIOR <br /> PLYWOOD. <br /> ' THE 2X4 OECKING AND THE ZX1O EDGING OF THE DECK SHALL BE CLEAR HEART <br /> REDWOOD. <br /> ' THE TRiM AT THE WINDOW CORNERS AND MULLS AND THE EDGING OF THE EX- <br /> TENDED SILLS SHALL BE WATER-REPELLENT PRESERVATIVE-TREATED CIEAR PINE. <br /> SECTION 0700 - INSULATION AND NOISTURE PROTECTION <br /> , INSULATION <br /> � THE ZX6 S1LL ON TOP OF THE CONCRETE BLOCK SHAtL HAVE FIBERGLASS SILL <br /> ' SEALER UNDER IT. <br /> THE EXTERIOR ZXB WALIS SHALL HAVE TWO THICKNESS OF 4 INCH FIBER GLASS <br /> PRICTION BATTS. <br /> ' THE ZX4 WALL BEHIND THE W000 STOVE SHALL BE FILLED WiTH URETHANE. <br /> THE AREAS UNDER THE PROJECTING SILLS SHALL HAVE TWO LAYERS OF �2 <br /> ' INCH FIBER GLASS FRICTION BATTS TO COMPLETELY FILL THESE AREAS WITH <br /> INSULAT {ON. <br /> THE RIM JOISTS SHALL HAVE �Z INCH FIBER 'GLASS FRICTION BATT INSUTAT- <br /> ' ION EXTENDiNG 1Z INCHES BEHIND THEM. <br /> T,HE CEIl1NG RIM JOISTS SHA�L 'HAVE '9�" F1BER GLASS FRI.CTION BATT . � <br /> INSULHTION EXTENGING 12 INCHES BEHIND� THEM. � <br /> ' THERE SHALL BE4� INCHES OF URETHANE ROOF INSULATION ON TOP OF THE <br /> ROOF SHEATHING. <br /> ' THE EXERCISE ROOM EXTERIOR WALLS SHALL HAVE 4 iNCHES OF FIBER GLASS <br /> FRICT {ON BATTS IN THEM. <br /> THE WINDOWS AND THE PAT10 DOOR SHALL HAVE FIBER GLASS INSULATION <br /> � PACKED BETWEEN THEM AND THE ROUGH OPENING. <br /> �(APOR BARRIER <br /> THE EXTERIOR WALLS AND THE CEILING SHALL HAVE 4 MIL POLYETHLENE FILM <br /> ' WITH JOINTS LAPPED A MINIMUM 4 INCHES. � <br /> DAMPPROOFiNG <br /> ' THE EXTERIOR SIDE OF THE CONCRETE BLOCK WALLS SHALL HAVE TROWLED ON <br /> MASTIC. ALLOW TO CURE 48 HOURS BEFORE BACKFILLING. <br /> ROOFING . <br /> ' FLA7 ROOF TO HAVE E)O MIL SINGLE PLY ROOFING. <br /> CAULKtNG � <br /> � CAULK AROUND WINDOWS AND PAT10 OOOR WITH MONO OR EOUAL. <br /> ' <br />