My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P08906 - new septic system
Orono
>
Property Files
>
Street Address
>
S
>
Spring Hill Road
>
0755 Spring Hill Road - 36-118-23-22-0003
>
Septic
>
2005-P08906 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:13 PM
Creation date
3/6/2019 12:49:11 PM
Metadata
Fields
Template:
x Address Old
House Number
755
Street Name
Spring Hill
Street Type
Road
Address
755 Spring Hill Road
Document Type
Septic
PIN
3611823220003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PT7MP SELECTION PROCEDURE pertorction Discharges in gpm <br /> A. Determine pump capacity: perforation diameter <br /> gravity distribution head �nches <br /> ..Minimum required discharge is 10 gpm (feet) 1/8* 3/16 7/32 1/4 <br /> `:2.Maximum suggested discharge i 45 m 1 Ao 0.18 0,42 0.56 0.74 <br /> pressure distribution 2•Ob 0.26 0.59 0.80 1.04 <br /> see pressure design worksheeet 5.0 0.41 0.94 1.26 1.65 <br /> Selected pump capacity: y� gpm M,�,-x. °Use 1.0 foot for single-famlly homes. <br /> b Use 2.0 feet for anythlrrg else. <br /> ' Potentlal for plugging <br /> B. Determine head requirements: <br /> 1.Elevation difference between pump and point of discharge. <br /> �_feet <br /> 2.Special head requirement: • <br /> If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold.If gravity system,zero. " feet � <br /> _ soil treatment ^ <br /> J...i / <br /> 3.Friction loss ' system .,, .:a w.s... 9 <br /> a.Enter friction loss table with gpm and pipe diameter. 1e� �� <br /> Read friction loss in feet per 100 fee�from table. in�et defference <br /> F.L. _ �'zg ft./100 ft of pipe p�� <br /> b.Determine total pipe length from pump to discharge ���������-��•-�•� � • ____..�� <br /> point.Estimate by adding 25 percent to pipe length for fitting <br /> loss.Equivalent pipe length times 1.25 =total pipe length <br /> �x 1.25 =�_feet <br /> c.Calculate total friction loss by multiplying friction loss Friction loaa in Plastic Pipe <br /> in ft/100 ft by equivalent pipe length. Per 100 teet <br /> Total friction loss= 3•a�S x�_+100= 3 �feet p(pe diameter <br /> 4.Total head required is the sum of elevation difference,special head flomrate 1.5" 2" 3" <br /> requirements,and total friction loss. 20 2.47 0.73 0,11 <br /> )Z + - + 3 (1) (2) (3�) <br /> Total head: I� feet so 5.2s i.� o.2s <br /> 35 6.96 2.06 0.30 <br /> 45 11.07 3.28 F�0.48 <br /> C. Pump selection 50 13.46 3.99 0,58 <br /> 'xt� , <br /> 1.A puxnp must be selected to deliver at least 4�S gpm wi 60 5.60 0.82 <br /> (Step A)with at least�_feet of total head (Step B). 65 6.48 0.95 <br /> 70 7.44 1.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.