My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic design - 2003
Orono
>
Property Files
>
Street Address
>
S
>
Spring Hill Road
>
0749 Spring Hill Road - 36-118-23-21-0004
>
Septic
>
septic design - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:02:10 PM
Creation date
3/6/2019 12:43:12 PM
Metadata
Fields
Template:
x Address Old
House Number
749
Street Name
Spring Hill
Street Type
Road
Address
749 Spring Hill Road
Document Type
Septic
PIN
3611823210004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , � <br /> , < < <br /> Keep atl heavy equipment off of the proposed treatment area before and after <br /> construction. The treatment area should be marked off before construction. This <br /> Design is not valid &the system will need to be relocated if failure to protect the areas <br /> proposed for On-Site Sewage Treatment occurs. <br /> With proper installation and maintenance, this system should have no problem in <br /> treating septic effluent effectively. <br /> Nothing other than human waste, toilet tissue, laundry, showers, water softener etc. <br /> should be disposed of into the septic tanks. Recommend Iron filters be diverted out of <br /> the system. Recommend to divert the water softner also if the iron filter is diverted. <br /> Garbage disposals are not recommended, due to adding more solids & fine solids <br /> passing through to the system. Excessive amounts of soaps, antibacterial soaps, <br /> cleaning agents, shower cleaners used every shower & chlorine agents may kill the <br /> bacteria needed to treat septic effluent. Additives are not recommended. Recommend <br /> to pump & clean your tanks through the manhole by a certified pumper every 2 years. <br /> Check with your pumper to set up a schedule. Recommend laundering be limited to 3 <br /> to 4 loads per day. <br /> r�� r <br /> �� <br /> Steven B. Schirmers <br /> �3"rSTEN�aE�l�D IqEf� <br /> .,�BEDROOMMS.. At►��E1tSElMl�1MI� <br /> �BE�Iii�EiOMSl�tAtICATE'Si tN�0�1. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.