Laserfiche WebLink
�4�7 <br /> , <br /> ���-�� <br /> � <br /> CITY OF ORONO SEPTIC SYSTEM PERMTI'APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,Mn 55323 <br /> JOB SITE ADDRESS � `7 � � 1����n�- }-� ��� I ��74 � <br /> Occupancy Type: Residential V Commercial Other <br /> Permit Type: New or Replacement System $100.00 /[7D. �C7 <br /> Repair Ezisting System $ 50.00 <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> Owner's Name: Jv�N�1 (�:i D YL�A l� Phone Number: <br /> Mailing Address: �]�-1 5 S�P,��r I-1 �� \ (� City: Zip: <br /> Contractor's Name: i7Qa,�.'S ICc�,�u A �S�C: Phone Number: "](�3- �"77 - ��S� � <br /> MailingAddress: City: (�o�i,C�i�Zip: �S� <br /> ,. <br /> *** DO NOT MAIL PAYMENT WITH THIS APPLICATION*** <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota.Pollution Control <br /> Agency(MPCA) Septic System Insta.11ers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank insta.11ation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is requued after <br /> rough up but prior to sand placement(sand will be jar tested for silt content), and again <br /> during pressure distribution piping insta.11ation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCAInstallers License shall be present during all inspections. A 24-hour <br /> notice is required for all inspections. <br />