My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00704 - demo
Orono
>
Property Files
>
Street Address
>
S
>
Spring Hill Road
>
0465 Spring Hill Road - 25-118-23-34-0002
>
Permits/Inspections
>
2010-00704 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:14:39 PM
Creation date
3/6/2019 9:53:12 AM
Metadata
Fields
Template:
x Address Old
House Number
465
Street Name
Spring Hill
Street Type
Road
Address
465 Spring Hill Road
Document Type
Permits/Inspections
PIN
2511823340002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Demolition debris will be kept off adjoining property and/or the public rights-of way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with a11 <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when all debris has been removed,before backfilling. <br /> 7. Within 5 working days of superstructure removal, a final inspection shall be requested. The <br /> site shall be left clean and clear of a11 debris,with any excavation filled with earth level with <br /> the adjacent ground elevation (except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 8. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks <br /> must be pumped, crushed and filled with native soils. An inspection is required after the <br /> tanks are pumped and before the tanks are crushed and filled. <br /> 9. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses, including attorney fees, against the City, its agents, employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> � $75.00-Principal Structure <br /> ❑ $50.00-Accessory Structure (how many) (what) <br /> l. Subtotal of above permit requested � 7�j . 00 <br /> 2. State Surcharge � 5.00 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) � � . �O <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees <br /> to do all the work in a strict accordance with the ordinances of the City and the regulations of <br /> the State of Minnesota, and certifies that all state lents made on this application are complete, <br /> true and correct. <br /> �-� <br /> Applicant's Signature: Date: S � � 2d I o <br /> Owner's Signature: Date: �/ �2,0 0 <br /> Approved By: Date: $ - I 1 - �� <br /> (Building Official) <br /> * Zoning Disclosure Re uired? ❑ YES ❑ O <br /> *T'his must be filled out by Z nin e artment—For 'ther sw r,a Zoning Official mus sign all appiications. <br /> * Approved By: ��+ Date: 7 <br /> (Zonmg O�c' <br />
The URL can be used to link to this page
Your browser does not support the video tag.